Plant line, 24/7 +1-555-0164[email protected]

Site report SR-188. Pipelines. 9 windows, all signed.
Fictional client, sample figures

Six compressor stations on one segmentation plan

§1 Site sheetSR-188 / Sample figures

Two engineers at a factory control console with a window onto the plant floor
Stations, each now its own zone
6
9 windows, all signed

Site sheet

Sector

Pipelines, one gas transmission operator

Scope

6 stations, 1 control centre, 344 devices

Findings

2 High, 11 Low

Windows

9 used, all signed

Result

Each station now its own zone

One flat network, from the control centre to every station.

Written for the plant manager: what we found on the floor, how the work ran, and what is different now.

§2.1 On the floor

Six compressor stations and one control centre shared a single flat network. A fault at one station could reach every other one, and the TSA Security Directives asked the operator to show a plan.

§2.2 How we worked

We listened for four weeks at the control centre and two stations, then drew one zone per station with one conduit back to the centre. Each station was cut over in its own window, with its crew on site.

§2.3 Now

Nine signed windows and no unplanned stop. Each station is now its own zone, and traffic between stations goes through the control centre or not at all.

§3 FindingsSR-188 / Sample figures

Two engineers in hard hats with a laptop walking a plant gantry beside an open cabinet
Totals, SR-188

High

2

Low

11

Windows used

9

Thirteen findings. Both High ones in full.

Severity

Finding

Status

High

One flat network across all six stations

Closed in W8

High

Vendor access straight into stations 2 and 5

Closed in W9

Low

Station HMIs on an unsupported operating system

Shielded

Low

No record of who changes compressor logic

Logged since W1

9 more Low findings are in the client's copy of SR-188.

§4 Window logSR-188 / Sample figures

Nine windows, each one signed.

Copied from the site log. Every window had a date, a rollback and a signature before it opened.

When

Work

Signed by

Line

Weeks 1 to 4

Sensors at the control centre and stations 1 and 4

Wardline

No outage

Week 5

Zone plan agreed, one zone per station

Control manager

No outage

W1

Control centre firewall, one conduit per station

Control manager

Signed window

W2

Station 1 cut over to its own zone

Control manager

Signed window

W3

Station 2 cut over to its own zone

Control manager

Signed window

W4

Station 3 cut over to its own zone

Control manager

Signed window

W5

Station 4 cut over to its own zone

Control manager

Signed window

W6

Station 5 cut over to its own zone

Control manager

Signed window

W7

Station 6 cut over to its own zone

Control manager

Signed window

W8

Old routes between stations removed

Control manager

Signed window

W9

Vendor access moved to the control centre gateway

Control manager

Signed window

Afterwards

Month 2

Zone plan filed with the operator's security plan

Wardline

Filed

Month 3

First monthly monitoring report

Wardline

Monthly

§5 Plant noteSR-188 / Sample figures

Every cut-over had the station crew on site and a rollback taped inside the cabinet. We never needed one.

Pipeline control manager. Fictional.
What changed

One zone per station

One conduit per station, to the control centre

Vendor access only through the centre gateway

§6 More site reportsEnd of SR-188