Plant line, 24/7 +1-555-0164[email protected]

Site report SR-176. Manufacturing. 6 windows, all signed.
Fictional client, sample figures

A parts plant puts its machine vendors behind one gate

§1 Site sheetSR-176 / Sample figures

Two engineers in hard hats with a laptop on a cart beside a production line
Vendor remote tools, before and after
11 to 1
One timed and logged gateway

Site sheet

Sector

Manufacturing, one parts plant

Scope

1 plant, 4 lines, 520 devices

Findings

1 High, 8 Low

Windows

6 used, all signed

Result

Eleven vendor tools replaced by one timed gateway

Eleven machine builders, eleven ways in.

Written for the plant manager: what we found on the floor, how the work ran, and what is different now.

§2.1 On the floor

Four lines of presses, welders and robot cells, bought from eleven machine builders. Each one shipped with its own remote support tool, left running so the vendor could dial in when a fault came up.

§2.2 How we worked

In its first week the sensor listed 520 devices and all eleven tools. We agreed one gateway with the maintenance lead, then moved the vendors over a line at a time, inside signed windows.

§2.3 Now

A vendor now asks for a session and gets a set time on one machine, under their own name, and every session is logged. The old tools are gone from every line PC.

§3 FindingsSR-176 / Sample figures

Technician wiring a network cabinet in a site back room full of parts
Totals, SR-176

High

1

Low

8

Windows used

6

Nine findings. The High one in full.

Severity

Finding

Status

High

Eleven vendor remote tools, always on

Closed in W5

Low

Robot cells share one controller password

Closed in W6

Low

Line PCs on an unsupported operating system

Shielded

6 more Low findings are in the client's copy of SR-176.

§4 Window logSR-176 / Sample figures

Six windows, each one signed.

Copied from the site log. Every window had a date, a rollback and a signature before it opened.

When

Work

Signed by

Line

Week 1

Sensor on the plant core switch

Maintenance lead

No outage

Weeks 1 to 3

Listen and list, 520 devices and 11 remote tools

Wardline

No outage

W1

Vendor gateway installed in the plant DMZ

Plant manager

Signed window

W2

Line 1 vendors moved, 3 tools removed

Plant manager

Signed window

W3

Line 2 vendors moved, 3 tools removed

Plant manager

Signed window

W4

Line 3 vendors moved, 2 tools removed

Plant manager

Signed window

W5

Line 4 vendors moved, 3 tools removed

Plant manager

Signed window

W6

Every line PC checked, no remote tool left

Plant manager

Signed window

Afterwards

Month 2

First monthly monitoring report

Wardline

Monthly

Month 4

Twelfth vendor added through the gateway, not a new tool

Maintenance lead

Logged

§5 Plant noteSR-176 / Sample figures

The vendors grumbled for a week. Now they book a session like anyone else, and I can see who was on which machine.

Maintenance lead, parts plant. Fictional.
What changed

One gateway for every machine vendor

Sessions timed and logged by machine

No remote tool left on a line PC

§6 More site reportsEnd of SR-176