Plant line, 24/7 +1-555-0164[email protected]

§1 Service 1 of 6Monthly, per site / See plans

Services / Monitoring

Passivemonitoring

A sensor on a mirror port reads a copy of your control traffic and cannot send a packet back. Your shift lead hears the next step in plain words, and on Shift and Steward an engineer on shift reads it first.

Open control cabinet with PLC modules and an industrial switch, a gloved hand on the door
One night on Line 4, sample data

02:10

Sensor sees a new device on L2

02:12

Engineer on shift reads it

02:31

Shift lead confirms a booked vendor laptop

02:40

Logged. The line ran all night.

§2 OverviewWhat this service is

See every device without touching one.

Most plants run controllers that were never built to answer questions. An active scan can fault them. Yet nobody can protect a network they cannot see.

We fit the sensor in under two hours, with no outage. It listens, builds the asset list and learns what normal looks like on each line. You hear from us when something new starts to talk.

Good fitPlants, utilities and stations whose control network cannot stop

Not a fitOffice IT on its own. We do not watch laptops and mail.

Your sideA controls lead for the walk, about 9 hours in the first 30 days

Term12 months per site, 30 days notice after that

§3 ScopeWritten into your agreement

What it reads. What it never does.

This table goes into your agreement almost as it stands. If a zone is not on it, we are not listening there.

Zone

What the sensor reads

From

What we may do

Who approves

L3.5 Plant DMZ

Reads:Historian copy, patch server traffic

From:Firewall mirror port

May do:Change a rule in a window

Approves:Plant manager signs the window

L3 Site operations

Reads:Engineering stations, remote sessions

From:Switch mirror port

May do:End a vendor session

Approves:Your shift lead, each time

L2 Area control

Reads:HMI and SCADA traffic, Line 1 to Line 6

From:Switch mirror port

May do:Listen only

Approves:Nothing to approve

L1 Basic control

Reads:PLC reads, writes and logic downloads

From:Hardware tap

May do:Listen only

Approves:Nothing to approve

L0 The process

Reads:Nothing

From:None

May do:Hands off

Approves:Not ours to touch

Not in scope

Business IT, laptops, mail and the cloud. Active scans of any kind. Fixing what we find is a separate job, done in a window you sign, or by your own team.

Fitting a tap

Most switches have a mirror port, so nothing stops. Where a hardware tap is needed, the cable break is planned in a signed window, with a rollback taped in the cabinet.

§4 What's includedListen plan and up

Seven lines on every plan.

All of this comes with Listen. Shift and Steward add engineers on shift and planning work. They do not unlock any of it.

Install time
2 h
or less, with no outage. Sample figure.
  • Sensor and installMirror port or hardware tap, fitted in under two hours.
  • Five control protocolsModbus TCP, EtherNet/IP, PROFINET, DNP3, OPC UA.
  • Asset list, kept currentEvery device, its firmware and the owner you name.
  • Weekly change digestNew devices, new routes, firmware and logic changes.
  • Night alerts in plain wordsTo your shift lead, with the next step written out.
  • Monthly site reportWhat changed, what we found and what can wait.
  • Your drawings stay yoursAsset list, zone map and reports leave with you.

§5 FAQBefore you sign

Questions from the controls lead.

Can the sensor fault a controller?

It cannot send. It receives a copy of the traffic from a mirror port or a tap, so no controller ever sees it or gets a question from it.

Do we need new switches?

Usually not. Most managed switches have a mirror port. Where one does not, we fit a hardware tap in a signed window.

Who reads the alerts at night?

On Listen, they go straight to your shift lead in plain words. On Shift and Steward, an engineer on our side reads each one first and calls when a decision is yours.

Does any traffic leave the site?

Raw traffic stays on the sensor, on your site, for 30 days. Only alerts, the change digest and the monthly report leave it.

What happens if we leave?

The asset list, zone map and reports are yours. We collect the sensor and wipe it in front of your controls lead.

§6 Site reportsWhere the sensor did the work

§7 Next stepHalf a day on foot

See what the sensor would see on your plant.

Plant line, 24/7