What Happens on a Handover Walk

The Aurelle studio team gathered around the long drawing table

The last day on site is not the day the scaffold comes down. It is the handover walk: two hours with Helena, our client director, the site lead and the owners, going through the house room by room and the roof plane by plane.

On the roof

From the scaffold, we check every course against the roof-plane drawing, every trim joint and every blank tile. Photographs go into the handover pack so the next roofer knows exactly what is under the slate.

In the plant room

The inverter, the battery niche and the isolators get labelled in plain words. We switch the house to backup and back again while everyone watches, so the first real outage is not a surprise.

In the app

We set up the schedule for the pool pump, the cellar cooling and the EV charger with the owners, not for them. Then we show them the one screen worth checking once a month.

What you keep

  • The as-built drawings, DWG and PDF.
  • Warranty documents for tiles, inverter and battery.
  • A care plan with the first two visits already booked.

Helena stays your phone number afterwards. That part never changes.

Written By

Partner · Lead Architect
Partner and lead architect. Draws every Aurelle roof plane in the client architect’s own model, and spends one Monday a month on the scaffold.
All Essays by Tomás Reyes
Keep reading

More From the Drawing Table

All Essays

Eight homes a year

Let’s Design a Roof Worth Looking Up At.

Bring the drawings to a 90-minute session — at the studio, on site or by video. You leave with a roof-plane sketch and a fixed fee.

Book a Consultation +1-555-0186
Visit the studio

Studio 3, Camino de las Lomas 14, Marbella Hills

+1-555-0186 [email protected] Tue–Sat · 9:30–18:00, by appointment