FLEET STATUS · 338 / 340 sites online · uptime 99.6% (2025)
Mon–Fri 7:00–18:00 CT     Careers     Client Portal
SALES DESK
+1-555-0188
HEAD OFFICE
1180 Meridian Pkwy, Ashford TX
FEASIBILITY
10-day desk study, no fee
Home / Company / How We Deliver
DOC NB-P04 · REV. 10/2026
[ Delivery programme ]

From desk study
to energised in 26 weeks.

One programme, one project manager, one weekly report. Five phases, four signed quality gates and a dated deliverable at the end of every one.

26 WEEKS TYPICAL
1 PROJECT MANAGER
4 QA GATES
PROGRAMME FILE
NB-DLV · 2026
26WEEKS
Median contract-to-energised time across the 41 projects we closed in 2025.
ON-TIME HANDOVER
93%
FASTEST ROOFTOP
8 weeks
WEEKLY REPORT
Fridays, 16:00 CT
 
ON THIS PAGE
01   Programme
02   Phases & deliverables
03   Quality gates
04   Reporting
01 / Programme

Five phases on one chart, updated every Friday.

Utility timelines are the only thing we don’t control — so the interconnection application goes in during week six, while design is still running, not after it.

PHASE · DELIVERABLE
W0
W2
W4
W6
W8
W10
W12
W14
W16
W18
W20
W22
W24
01
Feasibility
Layout, yield model, 3 price options
2 WKS
02
Design & engineering
Survey, structural letter, IFC drawings
6 WKS
03
Permits & interconnection
Building permit, utility agreement
12 WKS · UTILITY-LED
12 WKS
04
Build & commissioning
Own crews, testing, witness test
7 WKS
05
Operate & maintain
Monitoring, O&M, yield guarantee
25 YRS
Quality gates
G1
G2
G3
G4
 
NORTHBEAM WORK
 
UTILITY / AUTHORITY TIMELINE
 
OPERATIONS
 
SIGNED QUALITY GATE
02 / Phases & deliverables

What lands on your desk at the end of every phase.

Fifteen dated deliverables, each with a document code you will see again in the weekly report. If a deliverable slips, the report says so on the Friday it slips.

PHASE
WHAT WE DO
DELIVERABLES
YOUR INPUT
01
2 WEEKS

Feasibility

WHAT WE DO

We model 12 months of interval data, check the roof from drawings and satellite, and price all three ways to pay.

DELIVERABLES
D1.1
Layout & P50 / P90 yield model
D1.2
Three priced options
D1.3
Structural desk check
YOUR INPUT

12 months of bills or interval data; roof drawings if you have them.

02
6 WEEKS

Design & engineering

WHAT WE DO

Two survey days, core samples, a full load model and the electrical design taken to issued-for-construction.

DELIVERABLES
D2.1
Stamped structural letter
D2.2
IFC drawings & single-line diagram
D2.3
Independent yield report
YOUR INPUT

Site access for two days and sign-off on the final layout.

03
12 WEEKS

Permits & interconnection

WHAT WE DO

We file and chase the building permit and the utility application — starting in week six, in parallel with design.

DELIVERABLES
D3.1
Building permit
D3.2
Interconnection agreement
D3.3
Construction programme & method statement
YOUR INPUT

Signatures on the utility forms and one named facilities contact.

04
7 WEEKS

Build & commissioning

WHAT WE DO

Our own crews procure, install and test, then host the utility witness test. Tie-in shutdowns are planned to the hour.

DELIVERABLES
D4.1
Commissioning & test records
D4.2
As-built drawings & O&M manual
D4.3
Permission to operate
YOUR INPUT

A laydown area and one tie-in window of four hours or less.

05
25 YEARS

Operate & maintain

WHAT WE DO

Live monitoring, thermal drone surveys twice a year, preventive maintenance and the yearly yield-guarantee reconciliation.

DELIVERABLES
D5.1
Monthly performance report
D5.2
Annual yield reconciliation
D5.3
Drone thermal survey × 2 / yr
YOUR INPUT

Nothing, unless an alarm needs a site visit — then a parking space.

03 / Quality gates

Nothing moves to the next phase without a signature.

Four gates, each with a short checklist and a named signatory. Projects above 1 MWp get an independent engineer at G2 and G4, paid by us.

G1
WEEK 2

Feasibility sign-off

Yield model checked by a second engineer
Roof desk check passed
Prices held for 60 days
SIGNED BY
Lead engineer + client
G2
WEEK 8

Issued for construction

Stamped structural letter on file
Protection study & SLD checked
Fire and access plan approved
SIGNED BY
Head of Engineering
G3
WEEK 22

Mechanical completion

100% torque & ballast audit
IV-curve test on every string
Roof walk with your facilities team
SIGNED BY
Site lead + QA manager
G4
WEEK 26

Energised & handed over

Utility witness test passed
As-builts and O&M manual issued
Monitoring live for 7 days
SIGNED BY
COO + client
GATES PASSED FIRST TIME
87%
PUNCH ITEMS AT HANDOVER
6avg
INDEPENDENT REVIEW
> 1MWp
DEFECT CALL-BACKS, YR 1
1.4/ site
04 / Reporting

You never have to ask how the project is going.

The same report format from week one to year 25, so your facilities, finance and ESG teams read one document instead of three.

Weekly progress report
WEEKLY
Every Friday, 16:00 CT — programme, photos, risks, open RFIs.
Monthly performance report
MONTHLY
Yield against P50 and P90, availability, alarms closed.
Annual yield reconciliation
YEARLY
Guarantee settled in cash if the fleet missed 95% of P90.
Live portal
LIVE
15-minute data per string, shared with your finance team.
WEEKLY REPORT · NB-0431
WK 21 / 26
Tamsin Cold Chain — 1.6 MWp rooftop
Phase 04 · Build & commissioning
PHASE PROGRESS
62%
PROGRAMME
ON TRACK
STRINGS INSTALLED
186 / 300
SAFETY
0 incidents · 412 h
OPEN RFIs
2
NEXT WEEK
Inverter set, DC testing
Installation crew mounting solar modules on a commercial roof
PHOTO OF THE WEEK — module pallets lifted to roof zone C
Next step / Feasibility study

Send 12 months of bills. Get three priced options in 10 working days.

NO FEE · NO OBLIGATION · AN ENGINEER REPLIES IN ONE WORKING DAY
DIRECT LINES
SALES DESK
+1-555-0188
O&M DESK
24 / 7 / 365