[ FAQ ]

Straight answers
for commercial sites.

The questions facility, finance and procurement teams ask us most — answered by the engineers and analysts who deal with them every week.

24 ANSWERS
4 TOPICS
UPDATED 10/2026
ANSWER DESK
NB-FAQ · 2026
1WORKING DAY
The longest you wait for a reply when your question isn’t covered here — from an engineer, not a script.
QUESTIONS LOGGED 2025
1,140
MOST ASKED
Roof loading
ANSWER DESK
 
ON THIS PAGE
01   Feasibility & design
02   Build & grid
03   Finance & contracts
04   Operations & warranty
01–04 / Topics

Pick a topic, or read the lot.

Six answers per topic, written by the people who handle each question in real projects. Commercial specifics always depend on your site — the study turns these into numbers.

Feasibility & design
6
Build & grid
6
Finance & contracts
6
Operations & warranty
6
Portrait of Owen Reyes
Owen Reyes
Head of Engineering, PE

“If your question is about your own roof or tariff, send the drawings — I’d rather answer with numbers.”

ANSWER DESK
EMAIL
G-01 · TOPIC 01

Feasibility & design

6 ANSWERS

What do you need from us for a feasibility study?

Twelve months of electricity bills or, better, interval data from your utility portal; the site address; and roof drawings if you have them. We handle the satellite layout, load-table check and tariff model, and return three priced options in 10 working days.

Can our roof take the weight of a solar array?

Most roofs can. An array adds 10–30 kg/m² depending on the roof type and wind zone — less than most roofs were designed to carry in snow. The structural check in every study confirms it against your load tables; in 2025, 9% of the roofs we checked needed reinforcing first.

How do you size a system for our load profile?

From your interval data, not a rule of thumb. We match the array to your daytime load so most of the power is used on site, model the layout at P50 and P90, and show what each extra block of modules adds — or doesn’t.

Do we need battery storage, or just solar?

It depends on your tariff and how critical your loads are. Storage earns its place where demand charges are high or an outage is expensive — it can cut the peak by up to 38% and carry critical lines for 2–4 hours. The study prices solar alone and solar plus storage side by side.

Will the array affect our roof warranty?

Not when the roof manufacturer is involved early. We submit the layout and attachment details for approval, use their certified contractor for any membrane work and hand you a joint warranty letter at commissioning.

What if we lease the building rather than own it?

Many of our clients are tenants. We need the landlord’s consent and a roof access agreement for the contract term, which we draft and agree with their team. The term is set to fit your lease, and the agreement can pass to the next occupier if you move.

G-02 · TOPIC 02

Build & grid

6 ANSWERS

How long from signed contract to energisation?

Typically 26 weeks — the median across the 41 projects we closed in 2025; our fastest rooftop took 8. About 12 of those weeks belong to permits and the utility, so the interconnection application goes in during week six, while design is still running.

Will installation disrupt our operations?

Very little. Crews work from the roof or a fenced laydown area, with deliveries booked around your dock schedule. The one planned interruption is the switchboard tie-in — four hours or less, usually on a weekend.

Who handles permits and the utility interconnection?

We do. We file and chase the building permit and the utility application; you sign the utility forms and name one facilities contact. Both are tracked in the Friday report until they land.

What if the grid connection needs an upgrade?

You hear it in the feasibility study, not after signing. If a new transformer or switchgear is needed it is priced separately, on its own line, next to the option of a smaller system that avoids it.

Do you use subcontractors on site?

No — our own crews procure, install and test every system. The exception is work the site itself requires a specialist for, such as the roof manufacturer’s certified contractor for membrane work, and they work under our site lead.

What safety documentation do you provide?

Before mobilising you receive the construction programme and method statement, plus the fire and access plan approved at gate G2. The weekly report logs safety hours and incidents, and handover adds the commissioning and test records, as-built drawings and the O&M manual.

G-03 · TOPIC 03

Finance & contracts

6 ANSWERS

Which is cheaper over 25 years: PPA, lease or own?

Owning usually returns the most over 25 years — typical payback is 4–6 years. A PPA needs nothing upfront and starts below your grid rate; a lease swaps capital for a fixed rent. Every proposal prices all three from the same yield model, so your finance team compares like with like.

Do we need capital or a credit check?

No capital for a PPA or lease — both start at $0 upfront. Both do need a credit check: our finance desk reviews two to three years of accounts for the company that occupies the site. Where credit is thin, a parent guarantee or a shorter term usually closes the gap.

Who claims the incentives?

Incentives vary by location, and we model only what applies to your site. If you own the plant, you claim them. Under a PPA or lease the fund that owns the plant claims them, and their value is priced into your rate or rent. We only model programmes in force on the day of the proposal, and each proposal names who claims what.

What happens to a PPA if we sell the building?

The agreement transfers with the property: the buyer takes over the same rate and term, or you buy the system out at the scheduled price before completion. Both routes are written into the contract.

How is the yield guarantee measured and paid?

Once a year, against 95% of the P90 yield in your proposal. The annual yield reconciliation compares metered output with that figure, and if the system fell short we pay the difference in cash. In 2025 the fleet averaged 102% of P50.

Can we buy the system out early?

Yes. A PPA can be bought out from year 6 at fair market value, and every proposal includes an indicative buy-out price for each year after that. A leased system becomes yours for $1 at the end of the term.

G-04 · TOPIC 04

Operations & warranty

6 ANSWERS

Who monitors the system once it is live?

Our O&M desk in Ashford, 24 / 7 / 365 — the same team that designed and built it. Every string reports 15-minute data to the live portal, which your facilities and finance teams can see too.

How fast do you respond to a fault?

Alarms reach an engineer as they happen, and many are cleared remotely. When a fault needs hands on site, our service level is under four hours to site. Fleet uptime was 99.6% in 2025.

What warranties come with the equipment?

25 years on modules, 12 on inverters and 10 on our workmanship, with inverter cover extendable to 20 years. On top of the equipment warranties sits the yield guarantee, for its full 25-year term.

How often are panels cleaned and inspected?

A thermal drone survey every six months finds hot spots and failing strings before they show in the yield, and preventive maintenance follows the O&M manual. Cleaning is booked when the monitoring shows soiling losses worth recovering, not on a fixed calendar.

What reporting will we receive?

During the build, a weekly report every Friday at 16:00 CT. Once live, a monthly performance report — yield against P50 and P90, availability, alarms closed — and the annual yield reconciliation, in the same format for 25 years.

What happens at the end of the contract?

Under a PPA you can extend the term, buy the system at fair market value or have it removed. A leased system becomes yours for $1. Owned systems keep running — they are designed for a life of 30+ years.

05 / Still asking?

Three ways to get a real answer.

Pick the route that fits. Every one of them ends with a named person at Northbeam, not a ticket number.

H-01

Talk to an engineer

A 15-minute call with a project engineer about your site. No sales script, no follow-up sequence.

MON–FRI · 7:00–18:00 CT
H-02

Get the tender pack

Certificates, insurance schedules, sample PPA and lease contracts and standard spec sheets in one download.

PDF · 38 PAGES · REV. 10/2026
H-03

Already a client?

Faults, monthly reports, site access and warranty claims go straight to the O&M desk in Ashford.

24 / 7 / 365 · +1-555-0166
Next step / Feasibility study

Send 12 months of bills. Get three priced options in 10 working days.

NO FEE · NO OBLIGATION · AN ENGINEER REPLIES IN ONE WORKING DAY