What a Year-One Performance Report Should Show

Actual versus P50, availability, losses by cause. If your report skips one, ask why.
Operations analyst monitoring solar sites on screens

Twelve months after a plant is energised, the owner should receive a report that answers one question clearly: did the system produce what was promised, and if not, why not?

Actual versus P50

P50 is the energy we expect in an average year. The report should show the measured yield against P50, corrected for the weather that actually happened. Across our fleet in 2025 the average was 101.6% of P50.

Availability

Availability is the share of time the plant could produce when the sun was up. Anything under 99% deserves an explanation. Our fleet ran at 99.6% availability in 2025, with fault response inside four hours on every contract.

Losses by cause

  • Soiling and snow
  • Shading, including new buildings next door
  • Inverter and string faults
  • Grid outages and curtailment
  • Planned maintenance

A good report separates these, so you can see which losses were weather, which were the grid and which were ours to fix. If your report shows only a single production number, ask for the breakdown.

Written By

Head of Engineering
Head of Engineering. Owen has signed off the electrical design of 140+ Northbeam sites and leads the storage team in Ashford. Before solar he designed substations for a Texas utility.
All notes by Owen Reyes, PE
Keep reading

Three notes that pair with this one.

All Insights
Next step · Feasibility study

Send 12 months of bills. Get three priced options in 10 working days.

No fee, no obligation — an engineer replies in one working day.

Request a Feasibility Study
Direct lines

Talk to an engineer, not a call centre.

Sales desk · +1-555-0188[email protected]O&M desk · 24 / 7 / 365