Home / Services / Net-Zero Roadmaps
FILE KE-S02 · REV. 10/2026
[ Service S-02 ]

A net-zero plan
the board can fund.

Ten weeks from data to a costed plan: every measure in order, capital by year, and the Scope 1 and 2 carbon each step removes on the way to 2040. Written for the finance committee, not for a press release.

BOARD-READY
10 WEEKS
SCOPE 1 + 2 TO 2040
ROADMAP FILE
S-02 · NET ZERO
41PLANS
Net-zero roadmaps delivered to boards since 2020, each built on audit-grade data.
DURATION
10 weeks
SCOPE
1 + 2, to 2040
LEAD
Margot Ellery, CFA
 
ON THIS PAGE
01   What you get
02   Plan types
03   The roadmap
04   FAQ
What you get

A target with a price tag on every step.

Most net-zero targets start as a year and a slogan. Ours start with your meters: an audit or three years of interval data, every building’s end uses and the measures that would cut them, each with a cost and a modelled carbon saving.

We put those measures in the order that makes financial sense, add electrification and clean-power steps where the numbers work, and show the board what each five-year block costs and removes. If the target year doesn’t survive the arithmetic, we say so.

PLANS DELIVERED
41
HORIZON
2040
DURATION
10WKS
Adviser presenting a net-zero timeline to a management team
S-02 · ROADMAP WORKSHOP
Week 7 · options with the finance team
FIG. 01 — A week-7 options workshop · each card on the wall is a costed measure with its tonnes of CO₂e
EVERY ROADMAP INCLUDES
10 ITEMS
Scope 1 and 2 baseline from metered data
Measures ranked by cost per tonne
Capital plan by year, to 2040
Electrification steps, where they pay
Clean-power options and their timing
Modelled carbon curve against your target
Risks and assumptions in plain language
A 24-page roadmap and an 8-page board summary
Two workshops with your leadership team
A board presentation by Margot’s team
WHAT A ROADMAP IS NOT
A promise you will hit the target
IT SHOWS WHAT IT WOULD TAKE AND COST
A compliance filing
WE DON’T PREPARE STATUTORY DISCLOSURES
An offsets plan
REDUCTIONS FIRST · OFFSETS ARE YOUR CALL
Tax or legal advice
ASK YOUR OWN ADVISERS
Plan types

One method, four shapes of plan.

The scope depends on what you already have. A recent Kestrel audit shortens the work; a large estate needs a portfolio view before a site-by-site one.

R-1

Single-site roadmap

One campus or plant, built from an audit register and the site’s capital cycle.

INPUT
Audit or 3 yrs of data
DURATION
10 weeks
SCOPE
1 + 2
OUTPUT
Roadmap + summary
R-2

Portfolio roadmap

Many sites, grouped into archetypes so the plan scales without auditing every building first.

INPUT
Bills + drawings
DURATION
By portfolio
SCOPE
1 + 2
OUTPUT
Plan by site group
R-3

Roadmap refresh

An existing plan re-run against today’s prices, completed projects and new equipment options.

INPUT
Your current plan
DURATION
Shorter
SCOPE
1 + 2
OUTPUT
Updated model
R-4

Electrification study

A focused look at replacing boilers and fossil plant: costs, grid capacity and timing.

INPUT
Plant data + bills
DURATION
By site
SCOPE
Scope 1 heat
OUTPUT
Options + phasing
HOW IT RUNS
Ten weeks, two workshops, one vote.
01
WEEKS 1–3
Baseline
Metered Scope 1 + 2, end uses
02
WEEKS 4–6
Measures
Costs, tonnes, ranking
03
WEEK 7
Workshop
Options with your leadership
04
WEEK 10
Board
Roadmap, summary and presentation
Roadmap cases

Organisations working to a Kestrel plan.

A six-storey medical office building with timber cladding, rooftop solar and planted terraces

Orbis Medical Campus

6 buildings · 2.1M sq ft · 31% energy cut · net zero by 2038
$1.4M / yr
University campus with brick teaching buildings and a modern energy centre

Westgate University

64 buildings · heat network · $2.1M incentives secured
$2.3M / yr
The roadmap

What the board receives in week ten.

Two documents, one model. The roadmap carries the detail; the board summary carries the decision. Your team keeps the model and can re-run it as prices and plans change.

ROADMAP PACK · SCOPE 1 + 2
REV. 10/26
ITEM
WHAT IT IS
NOTE
BASELINE
Scope 1 + 2 from metered data
Weather-normalised
MEASURES
Ranked by cost per tonne
From audit or interval data
CAPEX PLAN
Capital by year to 2040
In five-year blocks
CARBON CURVE
Modelled against your target
Gap shown honestly
CLEAN POWER
On-site, PPA or tariff options
Vendor-neutral
ROADMAP
24 pages
Detail for the project team
BOARD SUMMARY
8 pages
Written for the finance committee
TIMELINE
10 weeks
Two leadership workshops
FEE
Fixed, quoted after scoping
Agreed before we start
An energy adviser presenting printed charts to executives around a boardroom table
SINCE 2020
Plans that boards have taken to a vote.
41
Roadmaps delivered
10WKS
Data to decision
FAQ

Roadmap questions boards ask first.

Short answers here. Margot’s team will walk you through a sample roadmap on a call before you scope anything.

Portrait of Margot Ellery
Ask Margot Ellery’s team
Head of Net-Zero Strategy
PHONE
REPLY
Within two working days

Do we need an audit first?

Not always. Three years of interval data and building information can support a first roadmap. A recent audit makes the measure costs firmer and usually shortens the work.

Will the plan get us to net zero by our target year?

It will show what it would take and what it would cost. Sometimes the arithmetic says the year is achievable; sometimes it says the year needs to move or the budget needs to grow. We report either honestly.

Does it cover Scope 3?

Our roadmaps cover Scope 1 and 2, where your own capital decisions make the difference. We can note the largest Scope 3 categories, but we don’t model supply chains.

Can the roadmap be used for disclosure reports?

The baseline and carbon curve are built from metered data and documented assumptions, which reporting teams find useful. We don’t prepare statutory filings or give legal advice on them.

Who presents it to the board?

Margot or a senior adviser presents with your sponsor. Most boards want to question the person who built the numbers, so we plan for that.

Do you sell the measures in the plan?

No. Kestrel sells no equipment and takes no installer or developer commission, so the order of the plan reflects cost per tonne, not anyone’s product list.

Next step / Free desk review

Send twelve months of bills. We will tell you where the waste probably is.

FREE · 5 WORKING DAYS · A SENIOR ADVISER CALLS, NOT A SALES TEAM