Home / Services
FILE KE-P02 · REV. 10/2026
[ Services ]

Six services,
one independent desk.

Audits find the waste, roadmaps put it in order, procurement and grants help pay for it, and M&V shows what actually arrived. Every service is fixed-fee, and none of them comes with equipment attached.

FIXED FEES
NO EQUIPMENT SOLD
PE-STAMPED REPORTS
SERVICES FILE
KE-SV · 2026
22% FOUND
Average share of energy spend our Level 2 and 3 audits identify as avoidable — a modelled estimate, ±15%.
AUDITS SINCE 2014
620+
FIXED FEE FROM
$18,500
DESK REVIEW
Free · 5 working days
 
ON THIS PAGE
01   Pairings
02   Which fits
03   Six services
04   Questions
Common pairings

Two services that work better together.

Three combinations clients ask for most, each with a case where the result was measured afterwards rather than estimated up front.

PAIR 01
MEASURED CASE

Audit + M&V

Find the savings, then prove them. Monthly M&V turns the audit’s modelled range into a measured number the finance team will sign off.

ENERGY CUT
PAYBACK
22%
2.1YRS
REF · CALDER FOODS · KE-C03 · FOOD & COLD CHAIN
PAIR 02
MEASURED CASE

Audit + Procurement

The audit cuts the load first; the procurement desk then sizes clean power to what is left — not to what a developer wants to sell.

ENERGY CUT
ROOFTOP PPA
33%
4.2MW
REF · NORTHGATE DISTRIBUTION · KE-C09 · LOGISTICS
PAIR 03
MEASURED CASE

Audit + Grants

Most audit measures qualify for a utility rebate or public incentive. Applying while the audit is fresh keeps the paperwork short.

FOUND A YEAR
INCENTIVES
$1.12M
$214K
REF · HARBOR MILLS · KE-C02 · MANUFACTURING
Which service fits

Not sure where to start? Start here.

The four services clients most often weigh against each other. If none of them fits, the free desk review will tell you which one does — or that you need none.

SWIPE TABLE
CRITERION
S-01
Energy Audit
S-02
Net-Zero Roadmap
S-03
Tariff Analysis
S-05
M&V
BEST WHEN
Bills feel high, no clear reason
The board wants a target and a plan
Bills look wrong or a tariff changed
Measures go in this year
YOU PROVIDE
12 months of bills + site access
An audit or 3 years of data
12–36 months of bills
Meter access + the baseline
FEE
Fixed, from $18,500
Fixed, quoted after scoping
Fixed, quoted after scoping
Fixed monthly fee
TIMELINE
4–8 weeks
10 weeks
A desk study, no site visit
12 months, reported monthly
YOU GET
80-page report + measure register
24-page roadmap + board summary
Tariff memo + billing claims
Monthly IPMVP report
USUAL NEXT STEP
Roadmap or M&V
Procurement
An audit, if waste shows
A yearly savings statement
SAVINGS IN AUDITS ARE MODELLED RANGES (±15%) · MEASURED RESULTS COME FROM M&V · NO GUARANTEED SAVINGS
Six services

Find it, plan it, fund it, prove it.

Each service stands on its own and each has its own page. Most clients start with an audit or a free desk review and add the rest only if the numbers justify it.

Auditor scanning a rooftop air handling unit with a thermal camera
S-01
S-01 · AUDITS

Energy Audits

ASHRAE Level 2 and 3 audits: two engineers on site for 2–4 days, sub-metering and a thermal survey, then a measure register with costs, savings ranges and paybacks.

LEVEL
ASHRAE 2 & 3
DURATION
4–8 weeks
FEE
Fixed, from $18,500
AVG. FOUND
22% of energy spend
Adviser presenting a net-zero timeline to a management team
S-02
S-02 · ROADMAPS

Net-Zero Roadmaps

A costed, board-ready plan to cut Scope 1 and 2 emissions to 2040: measures in order, capital by year and the carbon each step removes.

HORIZON
To 2040
DURATION
10 weeks
SCOPE
Scope 1 + 2
PLANS DELIVERED
41
Hands checking a stack of printed utility bills with a pencil
S-03
S-03 · TARIFFS

Utility & Tariff Analysis

Twelve to thirty-six months of bills checked line by line: rate class, demand charges, billing errors and supply-contract terms.

INPUT
12–36 months of bills
TYPICAL RESULT
Avg. 6% off bills
FEE
Fixed, agreed up front
OUTPUT
Tariff memo + claims list
Solar carport canopies over an office car park with electric cars charging
S-04
S-04 · PROCUREMENT

Renewable Procurement

Vendor-neutral advice on on-site solar, power purchase agreements and green tariffs: we model the options, run the tender and read the contract.

OPTIONS
On-site · PPA · tariff
DEVELOPER FEES
None, ever
PPAS ADVISED
40
OUTPUT
Options model + tender
Analyst reviewing monthly savings charts on two monitors
S-05
S-05 · M&V

Measurement & Verification

IPMVP Option C verification, reported monthly and weather-normalised against the audit baseline, so the board sees what savings actually arrived.

METHOD
IPMVP Option C
REPORTING
Monthly
PLAN
M&V plan, 12 pp
LEAD
Samuel Adeyemi, CMVP
Adviser sorting incentive application folders with a facilities director
S-06
S-06 · GRANTS

Grants & Incentives

We find the utility rebates and public incentives your measures qualify for, write the applications and track each one to payment.

AVG. SECURED
$380k per client
SECURED TO DATE
$41M
FEE
Fixed, agreed up front
LEAD
Priya Raman
Questions

Before you book, the questions we hear first.

If your question isn’t here, the advisory desk will walk you through a quote line by line on the phone.

Portrait of Claire Ashdown
Claire Ashdown
Founder & Principal Engineer
ADVISORY DESK
EMAIL

Why not a share-of-savings fee?

Because it pays the adviser more for bigger estimates. A fixed fee means our only interest is getting the numbers right — including telling you when a measure isn’t worth doing.

What does the $18,500 cover?

A single-site ASHRAE Level 2 audit: two engineers on site for 2–4 days, sub-metering, the full five-document pack in week six and a results meeting. Larger or more complex sites are quoted after the free desk review.

Will the audit pay for itself?

Often, but we can’t promise it. Across 620+ audits the average register has found about 22% of energy spend, with a 3.1-year average payback on measures clients installed. Every estimate is a modelled range.

Are travel and expenses extra?

Your quote states them up front as part of the fixed fee, so there is no surprise invoice after the site visit.

Can incentives help with the fee or the measures?

Some utility programmes support audits or the measures they recommend. Every register flags the incentives each measure may qualify for; our grants desk can apply for you on a separate fixed fee.

Do you advise on the tax treatment of the work?

No. We don’t give tax advice. If tax treatment matters to your decision, please speak to your own accountant or adviser.

Next step / Free desk review

Send twelve months of bills. We will tell you where the waste probably is.

FREE · 5 WORKING DAYS · A SENIOR ADVISER CALLS, NOT A SALES TEAM