Home / Results / Calder Foods
FILE KE-P13 · REV. 10/2026
[ Case KE-C03 · Food & Cold Chain ]

Calder Foods,
a colder plant on 22% less.

An ammonia refrigeration plant running two blast freezers on a single fixed head pressure. Floating head pressure, drives on the condenser fans and demand defrost did most of the work.

FOOD & COLD CHAIN
BROOKFIELD, VT
2.1-YEAR PAYBACK
CASE FILE
KE-C03 · REV. 10/26
$640k/ YR
Measured saving after twelve months of M&V, adjusted for tonnes frozen and outdoor temperature.
ENERGY CUT
22%
PAYBACK
2.1 years
PRODUCT TEMPERATURE
Unchanged, −22 °F
 
ON THIS PAGE
01   Audit sheet
02   Client voice
03   Measured year
04   Timeline
01 / Audit sheet

Two blast freezers, one fixed setpoint, 17 fixes.

Every figure comes from the audit report, the refrigeration logs or the M&V reports. Product temperatures were logged throughout — none moved.

Technician reading a meter in an ammonia refrigeration engine room
KE-C03
LEVEL 2 AUDIT · 2024
FIG. 01 — Ammonia engine room, compressors 1–4
AUDIT WEEK 2
FIG. 01 — Ammonia engine room, compressors 1–4
AUDIT WEEK 2
AUDIT SHEET · KE-C03
PE STAMPED
SCOPE
Frozen-food plant · 2 blast freezers
REFRIGERANT
Ammonia, 4 compressors
AUDIT
ASHRAE Level 2 · 4 weeks
BASELINE
14.2 GWh a year
MEASURES FOUND
17
MEASURES CARRIED OUT
12
SAVING (MEASURED)
$640k a year
ENERGY CUT
22%
PAYBACK
2.1 years
LEAD AUDITOR
Leah Moran, CEM
CHALLENGE
The plant held a fixed condensing pressure all year “to be safe”, defrosted on timers and ran condenser fans at full speed even on January nights.
OUR RESPONSE
Logged every compressor and evaporator for two weeks, then specified floating head pressure, drives on the condenser fans, demand defrost and a blast-freezer loading schedule.
RESULT
A 22% cut measured over twelve months — $640k a year — with product temperatures unchanged and one compressor now spending winter on standby.
02 / Client voice
“We assumed the setpoints were there for a reason. Leah’s logs showed they were there because nobody had looked since commissioning.”
OB
Owen Bellamy
ENGINEERING MANAGER · CALDER FOODS
M&V YEAR 1
IPMVP OPTION C
METRIC
ESTIMATE
MEASURED
Refrigeration
−24%
−26%
Condenser fans
−48%
−51%
Defrost energy
−40%
−37%
Cost a year
$610k
$640k
Adjusted for tonnes frozen and outdoor dry-bulb temperature against the 2023 baseline.
03 / Measured year

The summer peak, cut where it hurt most.

Monthly plant energy in the baseline year and the first full year after the measures — the gap is widest in the cooler months, when floating head pressure does its work.

MONTHLY ENERGY · BASELINE VS MEASURED (MWh)
BASELINE YEAR
MEASURED YEAR
 
500 MWh
 
1,000 MWh
 
1,500 MWh
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
IPMVP OPTION C
TONNAGE-ADJUSTED
PRODUCT AT −22 °F
ANNUAL ENERGY BILL
M&V YEAR 1
LINE
BASELINE
MEASURED
Electricity
$2.38M
$1.86M
Demand charges
$0.41M
$0.31M
Gas
$0.12M
$0.10M
Total a year
$2.91M
$2.27M
−22%
ENERGY, MEASURED
$640k
SAVED A YEAR
05 / Timeline

Controls first, then the fans.

Most of the saving needed no new plant: setpoints and defrost logic changed in week one of the works, drives followed in the spring.

JAN 2024
 
Desk review
Winter bills barely lower than summer — a fixed head pressure.
REVIEW
FEB 2024
 
Level 2 audit
Four weeks of logging on every compressor and evaporator.
AUDIT
MAR 2024
 
Approval
Twelve measures approved, $1.34M capital over two phases.
DECIDE
APR 2024
 
Controls
Floating head pressure and demand defrost, commissioned in a week.
INSTALL
JUN 2024
 
Fan drives
Drives on 12 condenser fans, loading schedule for both freezers.
INSTALL
JUL 2025
 
Year 1 verified
22% measured; monthly M&V continues.
NOW
17MEASURES
In the register
12FANS
Now on drives
2.1YR
Payback, measured
0°F
Change in product temperature
MORE FROM THE REGISTER
Technician reading a meter beside two industrial air compressors
PREVIOUS · KE-C02

Harbor Mills

Manufacturing · Carver Falls, NH · $1.12M / yr
University campus with brick teaching buildings and a modern energy centre
NEXT · KE-C04

Westgate University

Higher Education · Westgate, CT · $2.3M / yr
Next step / Free desk review

Send twelve months of bills. We will tell you where the waste probably is.

FREE · 5 WORKING DAYS · A SENIOR ADVISER CALLS, NOT A SALES TEAM