Estimates are where savings start, not where they end. Our M&V desk measures what actually arrived — IPMVP Option C, weather-normalised against the audit baseline and reported every month.
Savings have a habit of fading. A control setting drifts, a contractor overrides a schedule, production grows — and by year two the promised figure has quietly gone. Without measurement, nobody can say which.
We fix a baseline from the audit period, adjust it for weather and occupancy, and compare every month’s metered energy against it under IPMVP Option C. When savings slip, the report says where and when, so the fix happens in weeks instead of at the next budget round.

Option C works on whole-facility meters, which most sites already have. Where a single measure needs isolating, we add temporary sub-metering.
One measure or package, verified for twelve months after it goes in.
Every measure on a site, tracked together against one adjusted baseline.
Many sites on one dashboard of monthly reports, with drift alerts ranked by value.
Temporary sub-meters on a single system when a whole-site meter can’t see the saving.



One page for the board, the detail for the engineers and the data behind both. Every report is reviewed by a CMVP-certified analyst before it leaves Wharf Street.

Short answers here. Samuel’s team will check your metering on a first call and tell you whether Option C will work for your sites.

A recognised method that measures savings at the whole-facility meter, comparing actual use with a baseline adjusted for weather, occupancy and other drivers. It suits packages of measures and most commercial sites.
No. M&V measures what happened; it doesn’t underwrite it. Across our clients the average measured cut after twelve months is 27%, but that is a past result, not a forecast for your site.
Usually not — Option C uses the utility or main meters most sites already have. Where a single measure needs isolating, we add temporary sub-meters for the period required.
Big changes — a new production line, an extension, a change in hours — are documented and the baseline is adjusted under the M&V plan, so savings aren’t overstated or hidden.
Yes. We need the audit or design baseline, the installation dates and meter access. Independence matters most here: we have no stake in the measures looking good.
A CMVP-certified analyst reviews every report and is named on it. The annual statement is written so your finance team and auditors can follow every adjustment.