Why Promised Savings Disappear in Year Two — and How to Stop It

1 min read
Settings drift, schedules creep and nobody notices. Monthly measurement and verification keeps a saving a saving.
Engineer clipping a temporary current clamp sub-meter inside an electrical panel

A project hits its target in the first year, everyone moves on, and by the end of year two half the saving has quietly gone. We see this on roughly one site in three that comes to us after someone else’s retrofit.

Why it happens

Controls get overridden for one hot afternoon and never reset. A new line goes in without updating the baseline. Maintenance swaps a drive back to full speed. None of it is visible on a monthly bill that also moves with weather and production.

What M&V does

Measurement and verification compares actual use with what the site would have used without the project, adjusted for weather and output. We follow IPMVP Option C for whole-site savings and Option B where a single system is metered.

What a monthly report looks like

  • Verified saving this month and to date, in dollars and kWh
  • The adjustment model and its accuracy
  • Any measure drifting more than 10% from plan
  • One action for the site team

“Promised savings are a forecast. Verified savings are a fact your auditor can check.” — Samuel Adeyemi, M&V Lead

Written By

Head of Net-Zero Strategy
Head of Net-Zero Strategy at Kestrel. Margot spent nine years planning grids for a utility before joining in 2017; she turns audit findings into roadmaps a board can fund and writes the Kestrel Brief every month.
All briefings by Margot Ellery
Keep reading

Three more briefings for the budget meeting.

All Insights