Ten weeks from data to a costed plan: every measure in order, capital by year, and the Scope 1 and 2 carbon each step removes on the way to 2040. Written for the finance committee, not for a press release.
Most net-zero targets start as a year and a slogan. Ours start with your meters: an audit or three years of interval data, every building’s end uses and the measures that would cut them, each with a cost and a modelled carbon saving.
We put those measures in the order that makes financial sense, add electrification and clean-power steps where the numbers work, and show the board what each five-year block costs and removes. If the target year doesn’t survive the arithmetic, we say so.

The scope depends on what you already have. A recent Kestrel audit shortens the work; a large estate needs a portfolio view before a site-by-site one.
One campus or plant, built from an audit register and the site’s capital cycle.
Many sites, grouped into archetypes so the plan scales without auditing every building first.
An existing plan re-run against today’s prices, completed projects and new equipment options.
A focused look at replacing boilers and fossil plant: costs, grid capacity and timing.


Two documents, one model. The roadmap carries the detail; the board summary carries the decision. Your team keeps the model and can re-run it as prices and plans change.

Short answers here. Margot’s team will walk you through a sample roadmap on a call before you scope anything.
Not always. Three years of interval data and building information can support a first roadmap. A recent audit makes the measure costs firmer and usually shortens the work.
It will show what it would take and what it would cost. Sometimes the arithmetic says the year is achievable; sometimes it says the year needs to move or the budget needs to grow. We report either honestly.
Our roadmaps cover Scope 1 and 2, where your own capital decisions make the difference. We can note the largest Scope 3 categories, but we don’t model supply chains.
The baseline and carbon curve are built from metered data and documented assumptions, which reporting teams find useful. We don’t prepare statutory filings or give legal advice on them.
Margot or a senior adviser presents with your sponsor. Most boards want to question the person who built the numbers, so we plan for that.
No. Kestrel sells no equipment and takes no installer or developer commission, so the order of the plan reflects cost per tonne, not anyone’s product list.