Home / Results / Brightwater Data Centre
FILE KE-P13 · REV. 10/2026
[ Case KE-C07 · Data Centres ]

Brightwater Data Centre,
PUE 1.62 to 1.38.

Two data halls with hot and cold air mixing in the aisles. Containment, higher supply temperatures and more free-cooling hours brought the PUE from 1.62 to 1.38 — with the IT load untouched.

DATA CENTRES
BRIGHTWATER, VA
8 MW IT LOAD
CASE FILE
KE-C07 · REV. 10/26
1.38PUE
Annual power usage effectiveness measured after twelve months, down from 1.62 in the baseline year.
SAVING (MEASURED)
$1.05M a year
ENERGY CUT
14%
PAYBACK
2.2 years
 
ON THIS PAGE
01   Audit sheet
02   Client voice
03   Measured year
04   Timeline
01 / Audit sheet

Two halls, mixed air, a lot of free cooling left on the table.

Every figure comes from the Level 3 audit, the BMS trend data or the M&V reports. The IT load is metered separately, so PUE changes are cooling and power-train only.

Engineer with a laptop and temperature probe in a contained data-hall cold aisle
KE-C07
LEVEL 3 AUDIT · 2024
FIG. 01 — Hall B cold aisle after containment
AFTER WORKS
FIG. 01 — Hall B cold aisle after containment
AFTER WORKS
AUDIT SHEET · KE-C07
PE STAMPED
SCOPE
8 MW IT load · 2 halls
AUDIT
ASHRAE Level 3 · 7 weeks
BASELINE
113.5 GWh a year
PUE
1.62 → 1.38
SUPPLY AIR
64 → 75 °F
FREE-COOLING HOURS
2,100 → 4,300 a year
SAVING (MEASURED)
$1.05M a year
ENERGY CUT
14%
PAYBACK
2.2 years
CHALLENGE
Hot exhaust air recirculated into cold aisles, so the halls were over-cooled to 64 °F to compensate — and the chillers ran when outside air alone could have done the job.
OUR RESPONSE
A Level 3 audit with temperature mapping on every row. Aisle containment, a supply-air setpoint inside the equipment guidelines and a re-written free-cooling sequence.
RESULT
PUE measured at 1.38 over twelve months, down from 1.62: $1.05M a year with no change to the IT load and no thermal alarms.
02 / Client voice
“Our operators were nervous about raising the setpoint. Kestrel mapped every rack first, so we raised it with data, not hope.”
SK
Sanjay Kulkarni
FACILITIES DIRECTOR · BRIGHTWATER DATA CENTRE
M&V YEAR 1
IPMVP OPTION B
METRIC
ESTIMATE
MEASURED
Annual PUE
1.36
1.38
Cooling energy
−41%
−38%
Free-cooling hours
4,500
4,300
Cost a year
$1.12M
$1.05M
Cooling and power train measured with isolated sub-meters; IT load metered at the PDUs. Slightly under the estimate — see the Results page.
03 / Measured year

The same IT load, less cooling every month.

Monthly total facility energy in the baseline year and the first full year after the measures — the gap is widest in the cool months, when free cooling now runs.

MONTHLY ENERGY · BASELINE VS MEASURED (MWh)
BASELINE YEAR
MEASURED YEAR
 
2,000 MWh
 
4,000 MWh
 
6,000 MWh
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
IPMVP OPTION B
IT LOAD UNCHANGED
0 THERMAL ALARMS
ANNUAL ENERGY BILL
M&V YEAR 1
LINE
BASELINE
MEASURED
Electricity
$6.30M
$5.42M
Demand charges
$1.20M
$1.03M
Total a year
$7.50M
$6.45M
1.38
PUE, MEASURED
$1.05M
SAVED A YEAR
05 / Timeline

Measured first, changed second.

Containment went in one row at a time with the halls live; the setpoint moved in 2 °F steps over six weeks, each step checked against the rack map.

FEB 2024
 
Desk review
PUE 1.62 on a modern site — the cooling had headroom.
REVIEW
Q2 2024
 
Level 3 audit
Seven weeks, 1,200 temperature points mapped.
AUDIT
JUL 2024
 
Containment
Both halls contained, row by row, fully live.
INSTALL
SEP 2024
 
Setpoint steps
64 → 75 °F in 2 °F steps over six weeks.
TUNE
OCT 2024
 
Free cooling
New economiser sequence commissioned.
INSTALL
OCT 2025
 
Year 1 verified
PUE 1.38 measured; monthly M&V continues.
NOW
1.38PUE
Down from 1.62
4,300H
Free cooling a year
8MW
IT load, unchanged
0ALARMS
Thermal, all year
MORE FROM THE REGISTER
Public works depot with service vans and a solar roof
PREVIOUS · KE-C06

Pierce County

Public Sector · Pierce County, OR · $1.9M / yr
Adviser and building manager reviewing energy graphs in a control room
NEXT · KE-C08

Fulton Square Offices

Commercial Offices · Easton, MA · $860k / yr
Next step / Free desk review

Send twelve months of bills. We will tell you where the waste probably is.

FREE · 5 WORKING DAYS · A SENIOR ADVISER CALLS, NOT A SALES TEAM