[ Case KE-C09 · Logistics & Storage ]

Northgate Distribution,
a third off, plus the roof.

Three distribution centres with high bays lit around the clock. LED with occupancy controls, dock-door seals and a 15-year rooftop solar PPA tendered without a broker’s commission.

LOGISTICS & STORAGE
NORTHGATE, PA
4.2 MW ROOFTOP PPA
CASE FILE
KE-C09 · REV. 10/26
$1.3M/ YR
Measured saving across three centres after twelve months, including PPA power at the contract price.
ENERGY CUT
33%
SOLAR
4.2 MW rooftop PPA
PPA TERM
15 years, fixed price
 
ON THIS PAGE
01   Audit sheet
02   Client voice
03   Measured year
04   Timeline
01 / Audit sheet

Three centres, 2.4M sq ft, lights on all night.

Every figure comes from the audit report, the PPA tender file or the M&V reports. Grid energy and PPA energy are reported separately.

Distribution centre interior with racking under LED high-bay lights
KE-C09
LEVEL 2 AUDIT · 2024
FIG. 01 — Centre 2 picking aisles under the new LED high bays
AFTER WORKS
FIG. 01 — Centre 2 picking aisles under the new LED high bays
AFTER WORKS
AUDIT SHEET · KE-C09
PE STAMPED
SCOPE
3 distribution centres · 2.4M sq ft
SERVICES
Level 2 audit · renewable procurement
BASELINE
27.6 GWh a year
LIGHTING
6,800 high bays → LED + sensors
SOLAR
4.2 MW rooftop PPA · 15 yrs
PPA BIDS
6 developers, vendor-neutral tender
SAVING (MEASURED)
$1.3M a year
ENERGY CUT
33%
CHALLENGE
Metal-halide high bays burning 24/7 in aisles visited a few times an hour, dock doors leaking heated air all winter and a roof the size of 40 football fields doing nothing.
OUR RESPONSE
LED with aisle-level occupancy sensors, dock seals and heater controls — then a vendor-neutral PPA tender: six developers, scored on price per MWh, terms and risk.
RESULT
A 33% energy cut measured over twelve months, $1.3M a year, and 4.2 MW of rooftop solar at a fixed price for fifteen years with no capital outlay.
02 / Client voice
“Every broker we spoke to was paid by a developer. Kestrel was paid by us, and the tender showed it — six bids, all on the same terms.”
CR
Carlos Rivera
VP REAL ESTATE · NORTHGATE DISTRIBUTION
PPA TENDER
SCORED 2024
CRITERION
WEIGHT
WINNER
Price per MWh
45%
1st of 6
Contract terms
25%
2nd of 6
Roof & warranty risk
20%
1st of 6
Track record
10%
3rd of 6
Criteria and weights agreed with Northgate before bids opened; Kestrel took no fee from any bidder.
03 / Measured year

Grid energy, a third lower every month.

Monthly grid energy across the three centres in the baseline year and the first full year after LED, controls and the PPA.

MONTHLY GRID ENERGY · BASELINE VS MEASURED (MWh)
BASELINE YEAR
MEASURED YEAR
 
1,000 MWh
 
2,000 MWh
 
3,000 MWh
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
IPMVP OPTION C
6,800 HIGH BAYS
PPA REPORTED SEPARATELY
ANNUAL ENERGY BILL
M&V YEAR 1
LINE
BASELINE
MEASURED
Electricity incl. PPA
$3.10M
$2.05M
Demand charges
$0.65M
$0.45M
Gas
$0.20M
$0.15M
Total a year
$3.95M
$2.65M
−33%
ENERGY, MEASURED
$1.3M
SAVED A YEAR
05 / Timeline

Lights first, then the roof.

LED and controls paid back fast enough to fund the dock works; the PPA tender ran in parallel and the array energised the following spring.

JAN 2024
 
Desk review
Night-time load almost equal to day — the lights.
REVIEW
FEB 2024
 
Level 2 audit
Three centres in six site days; roof survey for solar.
AUDIT
MAY 2024
 
LED & controls
6,800 high bays replaced, aisle sensors live.
INSTALL
JUN 2024
 
PPA tender
Six developers, one set of terms, scored openly.
TENDER
APR 2025
 
Array energised
4.2 MW on two roofs, 15-year fixed price.
SOLAR
APR 2026
 
Year 1 verified
33% less grid energy measured.
NOW
6,800BAYS
Converted to LED
4.2MW
Rooftop solar
6BIDS
In the PPA tender
15YRS
Fixed-price term
MORE FROM THE REGISTER
Adviser and building manager reviewing energy graphs in a control room
PREVIOUS · KE-C08

Fulton Square Offices

Commercial Offices · Easton, MA · $860k / yr
A six-storey medical office building with timber cladding, rooftop solar and planted terraces
NEXT · KE-C01

Orbis Medical Campus

Healthcare · Easton, MA · $1.4M / yr
Next step / Free desk review

Send twelve months of bills. We will tell you where the waste probably is.

FREE · 5 WORKING DAYS · A SENIOR ADVISER CALLS, NOT A SALES TEAM