Home / Services / How an Audit Works
FILE KE-P04 · REV. 10/2026
[ How an audit works ]

From a pile of bills
to a board decision.

Most audits take 4–8 weeks: a free desk review, two engineers on site for 2–4 days and a PE-stamped pack in week six. Five steps, four signed gates and a short note every Friday, so you always know where it stands.

4–8 WEEKS
ASHRAE LEVEL 2 & 3
PE-STAMPED
AUDIT FILE
KE-AU · 2026
6WEEKS
Typical time from the discovery call to the report pack on your desk for a single-site Level 2 audit.
DESK REVIEW
Free · 5 working days
ON SITE
2 engineers · 2–4 days
FIXED FEE FROM
$18,500
 
ON THIS PAGE
01   Five steps
02   Programme
03   The pack
04   Quality gates
Five steps

Five steps, and what we need from you at each one.

Fifteen documents across five steps, each with a date. If a date slips, the Friday note says so the week it slips — and why.

STEP
WHAT WE DO
WHAT YOU GET
WHAT WE NEED FROM YOU
01
DAYS 1–5

Desk review

WHAT WE DO

You send twelve months of bills. We read them, call you and send a two-page memo saying where the waste probably is — and whether an audit is worth it.

WHAT YOU GET
D1.1
Two-page desk memo
D1.2
Scope and fixed quote
D1.3
Data request list
WHAT WE NEED FROM YOU

Bills, a site list and twenty minutes on the phone. The review is free.

02
WEEK 2

Site survey

WHAT WE DO

Two engineers on site for 2–4 days: plant-room walk-down, loggers on the big loads, a thermal survey and a read of the controls.

WHAT YOU GET
D2.1
Logger plan
D2.2
Thermal survey images
D2.3
Walk-down notes
WHAT WE NEED FROM YOU

An escort, plant-room access and read-only access to the BMS.

03
WEEKS 3–5

Analysis & modelling

WHAT WE DO

Loggers come back, the end-use breakdown is built and every measure is costed and modelled against your interval data.

WHAT YOU GET
D3.1
End-use breakdown
D3.2
Draft measure register
D3.3
Incentive matches
WHAT WE NEED FROM YOU

Answers on operating hours, production plans and projects already in the budget.

04
WEEK 6

Report & review

WHAT WE DO

A senior reviewer challenges every measure, a PE stamps the report and the pack is issued with each saving shown as a ±15% range.

WHAT YOU GET
D4.1
Audit report, about 80 pages
D4.2
Register (XLSX) + roadmap
D4.3
Board summary, 8 pages
WHAT WE NEED FROM YOU

Read the draft and tell us what we got wrong about your site.

05
WEEKS 7–8

Results & next steps

WHAT WE DO

We present to your board or finance team and agree what happens next: implementation, M&V, grants support — or nothing at all.

WHAT YOU GET
D5.1
Board presentation
D5.2
M&V plan, 12 pages
D5.3
Written decision log
WHAT WE NEED FROM YOU

Bring the people who sign capital requests to the results meeting.

Programme

A Level 2 audit, week by week.

Loggers stay on site for about three weeks while the analysis starts, so the register is built on measured loads, not nameplates. Level 3 adds up to two weeks of logging and detail.

STEP · WORK
W1
W2
W3
W4
W5
W6
W7
W8
01
Discovery & desk review
Call, bills, two-page memo
WK 1
02
Site survey
2 engineers on site, 2–4 days
WK 2
03
Loggers on site
Big loads, every 15 minutes
LOGGERS · 3 WKS
04
Analysis & modelling
Register, ranges, paybacks
WKS 3–5
05
Report & PE review
Named reviewer, pack issued
WK 6
06
Results & next steps
Board meeting, M&V plan
WKS 7–8
Signed gates
G1
G2
G3
G4
 
KESTREL WORK
 
LOGGERS ON YOUR SITE
 
RESULTS WITH YOUR BOARD
 
SIGNED GATE
The audit pack

Five documents on your desk in week six.

Every audit ends with the same pack, written for two audiences: the engineers who will implement and the board that will pay. While the work runs, a short note goes to your sponsor every Friday — see the sample note.

Audit report · about 80 pages
WEEK 6
PE-stamped, a named reviewer, every assumption printed.
Measure register (XLSX)
WEEK 6
Cost, modelled saving range and payback for each measure.
Roadmap 24 pp · board summary 8 pp
WEEK 6
Measures in order by year, explained for non-engineers.
M&V plan · 12 pages
WEEK 8
An IPMVP Option C baseline, ready if you implement.
FRIDAY NOTE · SAMPLE
WEEK 4
Food plant — ASHRAE Level 3 audit
Step 03 · Analysis & modelling · week 4 of 6
AUDIT PROGRESS
60%
PROGRAMME
ON TRACK
LOGGERS
14 of 14 returned
MEASURES LOGGED
19 so far
LARGEST END USE
Compressed air
NEXT WEEK
Reviewer challenge session
Audit kick-off meeting around a site plan in a client site office
PHOTO — the week-2 kick-off in the client’s site office, logger plan on the table
Quality gates

Four gates, four signatures, no surprises.

An audit only moves to the next step when someone named signs it off. The third gate is the one clients notice: a second engineer argues with every measure before a PE stamps the report.

G1
WEEK 1

Desk review go / no-go

Twelve months of bills read
Likely savings range stated
A fixed quote — or an honest “not worth it”
SIGNED BY
Senior adviser + your sponsor
G2
WEEK 2

Survey complete

Every plant room walked
Loggers placed on the big loads
Thermal survey and controls read
SIGNED BY
Lead auditor + your site escort
G3
WEEK 6

Report signed

Every measure challenged by a reviewer
Savings shown as ±15% ranges
PE stamp applied
SIGNED BY
Named reviewer + PE
G4
WEEK 8

Results agreed

Board or finance team briefed
Next steps written down
M&V plan handed over
SIGNED BY
Principal + your sponsor
AUDITS SINCE 2014
620+
AVG. SHARE OF SPEND FOUND
22%
REPORTS WITH A NAMED REVIEWER
100%
EQUIPMENT QUOTES IN OUR REPORTS
0EVER
Next step / Free desk review

Send twelve months of bills. We will tell you where the waste probably is.

FREE · 5 WORKING DAYS · A SENIOR ADVISER CALLS, NOT A SALES TEAM