Most audits take 4–8 weeks: a free desk review, two engineers on site for 2–4 days and a PE-stamped pack in week six. Five steps, four signed gates and a short note every Friday, so you always know where it stands.
Fifteen documents across five steps, each with a date. If a date slips, the Friday note says so the week it slips — and why.
You send twelve months of bills. We read them, call you and send a two-page memo saying where the waste probably is — and whether an audit is worth it.
Bills, a site list and twenty minutes on the phone. The review is free.
Two engineers on site for 2–4 days: plant-room walk-down, loggers on the big loads, a thermal survey and a read of the controls.
An escort, plant-room access and read-only access to the BMS.
Loggers come back, the end-use breakdown is built and every measure is costed and modelled against your interval data.
Answers on operating hours, production plans and projects already in the budget.
A senior reviewer challenges every measure, a PE stamps the report and the pack is issued with each saving shown as a ±15% range.
Read the draft and tell us what we got wrong about your site.
We present to your board or finance team and agree what happens next: implementation, M&V, grants support — or nothing at all.
Bring the people who sign capital requests to the results meeting.
Loggers stay on site for about three weeks while the analysis starts, so the register is built on measured loads, not nameplates. Level 3 adds up to two weeks of logging and detail.
Every audit ends with the same pack, written for two audiences: the engineers who will implement and the board that will pay. While the work runs, a short note goes to your sponsor every Friday — see the sample note.

An audit only moves to the next step when someone named signs it off. The third gate is the one clients notice: a second engineer argues with every measure before a PE stamps the report.