App Phone Title
App Phone Title M
 
 
Journal

Notes From the Charge Sheet.

Plain-English notes from our electricians and fleet engineers on tariffs, installs, workplace billing and depot sizing. A new one every other Thursday.

8 articles
Written by the crew
 
The Journal
Jul – Oct 2026
8articles

Each one ends with the one number worth checking on your own bill or depot.

 
 
 
 
 
 
 
 
 
 
 
The Journal
 
Home · App · Installation · Workplace · Fleet · Tariffs
 
 
 
 
Start here

Five Articles New Drivers Read First

Our care desk sends these after every first charge. Five short reads, and you will set your schedule like an electrician.

Charge Notes · Monthly

One email a month: tariff changes and what our fleet customers learned.

    No offers, no hand-offs. Unsubscribe in one click.
    01
    Four Photos, One Price: How Our Remote Survey Works
    Installation
    1 min
    02
    Do I Need a Panel Upgrade for a Home Charger?
    Installation
    1 min
    03
    Off-Peak Schedules: Set Your Charger in Two Minutes
    The App
    1 min
    04
    Time-of-Use Rates for EV Drivers
    Tariffs
    1 min
    05
    Per-kWh Billing for Workplace Chargers, Explained
    Workplace
    1 min
     
     
     
     
    Every article

    Browse by Topic

    All8
    Home Charging1
    The App1
    Installation2
    Workplace2
    Fleet1
    Tariffs1
    Electric car charging from a wall charger on the driveway of a house with a solar roof at sunset

    Charging an EV From Your Roof: The Real Numbers

    How many miles a 6 kW array really adds in a year, and when it beats the night rate.
    Read More
    Car charging under a lit carport at night

    Off-Peak Schedules: Set Your Charger in Two Minutes

    Ready-by times, tariff windows and why “charge now” costs three times as much.
    Read More
    Homeowner photographing her electrical panel for a remote survey

    Four Photos, One Price: How Our Remote Survey Works

    What we look for in your panel, meter and parking spot — and when we still visit.
    Read More
    Covered car park at dusk with a row of wall chargers lit in cyan and cars plugged in

    Per-kWh Billing for Workplace Chargers, Explained

    Set a rate, let drivers pay in the app, and see the payout land every month.
    Read More
    Electric vans charging at DC cabinets in a depot at night

    Sizing a Depot: kVA, Shifts and Why 60 kW Is Often Enough

    Most depots need fewer fast chargers than the first quote says. Here is the arithmetic.
    Read More
    Electrician fitting a breaker in a home electrical panel

    Do I Need a Panel Upgrade for a Home Charger?

    Usually not. Load management shares the supply you already have — here is when it can't.
    Read More
    1 2
     
    Four Photos · One Fixed Price

    Send the Photos Tonight.

    Home, workplace or depot — four photos from your phone and an electrician sends one fixed price the next working day. Permit included, holds for 60 days.

    3-yr parts & labour
     
    Permit included · 9 days to first charge
     
    Rather Talk It Through?

    Speak to an electrician, not a script.

    +1-⁠555-⁠0163
    Install line · Mon–Sat 7:30–⁠18:00
    [email protected]
    Replies the next working day
    1180 Meridian Road, Unit 4
    Workshop · Oakfield, CA 95000
    Fleet support 24/7
    [email protected]