The first fleet quote many operators see is a forest of 150 kW chargers and a new substation. For a van fleet that sleeps at the depot, that is usually the wrong answer. Kessling Parcel’s Oakfield depot runs 48 vans on its existing 400 kVA supply with six 60 kW DC posts and 42 AC bays.
Start with dwell time, not peak power
A delivery van that parks from 19:00 to 05:30 has ten hours to charge. A typical 120-mile route uses about 55 kWh. Spread over ten hours, that is 5.5 kW — a 7 or 11 kW AC bay does it with time to spare.
Where DC earns its place
- Double shifts: a van that comes back at noon and goes out again at 13:00 needs 20–80% in about 45 minutes. That is what the 60 kW posts are for.
- Late returns: the van that gets in at 23:00 after a long route.
- Spares: one fast post covers any AC bay that is out of action.
The kVA ceiling
Load management watches the depot’s whole supply and shares whatever is left after the building, the lights and the compressors. At Kessling it has never let the site go over 400 kVA in 14 months.
What the power study covers
Half-hourly site data for a month, every route’s mileage and return time, and a charging plan that shows every van full before the 5:30 roll-out — before anything is ordered.