The permitted Pinyon Gap site, open high desert with pinyon pines and a survey stake
The permitted Pinyon Gap site, open high desert with pinyon pines and a survey stake
 
 
 
Pinyon Gap

Pinyon Gap, Three Years to a Yes.

A 350 MW solar farm permitted in June 2026 in Iron County, Utah. The site plan changed after two open houses — and the permit now writes grazing, a road fund and a decommissioning bond into the project.

Iron County, Utah
Permitted · Jun 2026
 
Development
First meeting → permit
3years

From the first kitchen-table meeting with four landowning families to a unanimous county vote.

 
 
 
 
 
 
 
 
 
 
 
Project · Solar · permitted
 
350 MW · four families · 25-year leases
01The Site
 
Permitted · Jun 2026

A Plan the County Rewrote With Us

How Pinyon Gap went from a map to a permit, and what happens next.

01

The Land

Four families own the high-desert parcels at Pinyon Gap. Each signed a 25-year lease that keeps grazing on the land and pays whether or not the sun shines.
02

What Changed

Biological, cultural and visual studies came first. After two open houses we moved 40 acres of panels away from a seasonal wash that neighbours knew floods.
03

What Comes Next

With the permit in hand, we are signing a long-term buyer before ordering equipment. Construction would follow the same model: union crews, local hires, 35 years run from Sandoval.
 
Spec Sheet
Project TV-2023-09
Location
Iron County, Utah
Technology
Single-axis trackers (design)
Capacity
350 MWac
Status
Permitted, Jun 2026
Landowners
Four families, 25-year leases
Studies
Biological, cultural, visual
Design change
40 acres moved away from a seasonal wash
Next step
Long-term buyer before equipment orders
02Permit Log
 
4 steps · 3 years

Four Steps, One Unanimous Vote.

The road from first meeting to permit, and the hearing night in full.

Step
Time taken
Outcome
Status
Mar 2023
First landowner meetings
9 months
4 families
Leases signed
2024
Biological, cultural, visual studies
14 months
3 studies
Filed
Oct 2025
Two community open houses
2 evenings
40 acres moved
Plan changed
Jun 2026
County commission hearing
1 evening
Vote 5–0
Permitted
3 yrs
40 acres
350 MW
First meeting to permit
Moved from a seasonal wash
Permitted capacity
Hearing Night
11 Jun 2026
18:00
Doors open · site maps on the wall
18:30
Public comment begins
19:40
Grazing and a road fund added to the conditions
20:15
Commission votes 5–0
20:30
Landowners and neighbours stay for coffee
Next
Long-term buyer before equipment orders
Permit steps complete
4 / 4
 
 
 
 
 
 
 
 
03Gallery
 
Photos · Iron County

Around Pinyon Gap

The land as it is today, the people who shaped the plan and the wildlife the studies protect.

A rancher and a Terravolt land manager reading a map on a pickup tailgate
Lease review on a tailgate · 2023
Residents looking at site maps at a community open house
Residents looking at site maps at a community open house in a school gym
Open house in the school gym · Oct 2025
A desert tortoise beside a wildlife-permeable fence
A desert tortoise beside a wildlife-permeable fence at the edge of a solar farm
Wildlife-permeable fencing is written into the permit
04In Their Words

The Neighbours Knew the Wash

Lucia Ferrer, Head of Land & Communities, on the open houses.

Our maps said the ground was dry. A rancher at the second open house said it ran knee-deep every few summers. He was right, so forty acres moved. That is what the open houses are for.

Portrait of Lucia Ferrer
Lucia Ferrer
Head of Land & Communities · Terravolt
2 open houses
Vote 5–0
Aerial view of a hybrid solar and battery plant on the Texas plains at sunset
Previous Project
Arden Plains
Next Project
Juniper Wells
Juniper Wells solar rows on a snow-dusted Colorado plain
 
Land · Power · Partnerships

Let’s Build the Next Gigawatt.

Landowners, utilities, corporate buyers and suppliers — tell us about your site or your demand, and the right Terravolt team replies within two working days.

41 sites · seven states
 
Develop · build · own · since 2012
 
Rather Talk It Through?

Speak to the team that runs the plant.

+1-555-0190
Head office · Mon–Fri 8:00–17:30 MST
[email protected]
Landowners & communities
1200 Mesa Verde Blvd, Suite 900
Head office · Sandoval, AZ 85000
[email protected]
Investor relations