Solar and Storage, One Connection.

Panels and batteries behind a single grid connection, sharing one substation and one buyer. Saltbush Ridge in Arizona proved it in 2023; Arden Plains in Texas is next.

300 MW + 1.2 GWh running
Arden Plains 31% built
 
Saltbush Ridge
AZ · 2023
94%

Of the battery's charge comes from its own panels, with an 87% round trip.

 
 
 
 
 
 
 
 
 
 
 
Saltbush Ridge, AZ
 
300 MW solar + 300 MW / 1.2 GWh storage · one connection
01Where the Output Goes

One Day, Two Deliveries

Here is how Saltbush Ridge split a clear September day in 2026: straight to the grid while the sun was up, into the battery at midday, and back out from five until nine.

A Clear Day
A Cloudy Day
2.87GWh
Solar made, 07–19
94%
Of charge from own panels
1.04GWh
Delivered 17:00–⁠21:00
Saltbush Ridge · September
Energy
Solar to grid
07:00–⁠17:00
 
 
1.62 GWh
Solar to battery
09:00–⁠15:00
 
 
1.13 GWh
Grid to battery
Overnight top-up
 
 
0.07 GWh
Battery to grid
17:00–⁠21:00
 
 
1.04 GWh
Solar to grid
17:00–⁠19:00
 
 
0.12 GWh
Evening block for the buyer
Battery output reserved for 17:00–⁠21:00
 
4 h
02Performance
 
Saltbush Ridge · 2025 by month

Its Own Sun, Stored

The point of a hybrid is that the battery fills from the panels beside it. This is how much of Saltbush Ridge's charge did, month by month.

Charge from own panels · 2025
Contract minimum 85%, 94% for the year
 
 
 
 
 
 
 
 
 
 
 
 
Contract minimum · 85%
J
F
M
A
M
J
J
A
S
O
N
D
Jan–Dec 2025 · scale from 50% · metered at the shared substation; June, the brightest month, highlighted.
87%

Round Trip, Metered

Energy out of the battery as a share of energy in, measured at the substation meter.

1line

One Connection

Panels and batteries share a single 300 MW interconnection — no second line across the county.

03The Build

Two Plants, One Build

Solar and storage go up side by side on one schedule, with one substation, one crew camp and one commissioning programme. Arden Plains in Texas is 31% built and due in Q2 2027.

Mo 1
Shared Groundworks

One road network, one laydown yard and one substation pad for both plants.

Mo 6
Trackers + Pads

Solar piling and battery foundations run by parallel crews.

Mo 14
Modules + Containers

Panels strung while battery containers are set by crane and wired.

Mo 22
Joint Commissioning

Solar, storage and the shared connection tested together, then commercial operation.

Aerial view of a hybrid solar and battery plant on the Texas plains at sunset
One substation
One crew camp
Shared roads
18–24 months · Arden Plains 31% built · Commercial operation Q2 2027
A substation and battery enclosures at dusk
A substation and battery enclosures at dusk
 
Shared substation
One 300 MW connection for panels and batteries — the grid sees a single, steady plant.
04Specifications

The Numbers Behind One Meter

a.Plant
Reference site
Saltbush Ridge, AZ
Solar
300 MW AC
Storage
300 MW / 1.2 GWh
Connection
One, 300 MW
Coupling
AC-coupled
Trackers
Single-axis, bifacial
b.Performance
Round-trip efficiency
87%
Charge from own panels
94%
Evening block
17:00–⁠21:00
Monitoring
Every 5 s, Sandoval
c.Next Hybrid
Site
Arden Plains, TX
Size
610 MW + 0.8 GWh
Contracts
20-yr PPA + 15-yr tolling
Commercial operation
Q2 2027
PDF · fact sheet · Oct 2026
05Questions

Asked Before Pairing Them

The five questions buyers and utilities ask most about hybrid plants. The rest live on the FAQ page.

Talk to our energy markets team
+1-⁠555-⁠0190 · Mon–Fri 8:00–⁠17:30 MST. Buyers can ask for a shaped-delivery profile on the call.

Why pair solar and storage on one site?

They share land, roads, a substation and one interconnection — and the battery fills from panels that would otherwise be curtailed at midday.

What is shaped delivery?

The buyer gets power in the hours it needs it, not only when the sun shines. At Arden Plains a data-centre buyer takes solar by day and stored solar into the evening.

What contracts sit behind a hybrid?

Usually a long-term power purchase agreement for the energy and a tolling agreement for the battery. Arden Plains has a 20-year PPA and a 15-year tolling agreement.

Is a hybrid harder to permit?

Usually not — one site, one connection, one environmental review. The battery adds a fire-safety plan we agree with the county before construction.

Can an existing solar farm become a hybrid?

Often, yes. Every new layout reserves land and substation space for a battery block, so adding storage later needs no second connection.

 
Land · Power · Partnerships

Let’s Build the Next Gigawatt.

Landowners, utilities, corporate buyers and suppliers — tell us about your site or your demand, and the right Terravolt team replies within two working days.

41 sites · seven states
 
Develop · build · own · since 2012
 
Rather Talk It Through?

Speak to the team that runs the plant.

+1-⁠555-⁠0190
Head office · Mon–Fri 8:00–⁠17:30 MST
[email protected]
Landowners & communities
1200 Mesa Verde Blvd, Suite 900
Head office · Sandoval, AZ 85000
[email protected]
Investor relations