Aerial view of solar rows with battery containers and an access road
Aerial view of solar rows with battery containers and an access road
 
 
Projects

Forty-One Sites, One Control Room.

Solar farms, battery storage and hybrid plants across seven Southwest states — developed, built and kept by Terravolt. Every site page shows what it is and what it has done.

7 states
Reported output
 
Operating
Oct 2026
2.84GW

Solar running today, with 3.6 GWh of storage — and 1.12 GW more under construction.

 
 
 
 
 
 
 
 
 
 
 
Projects
 
41 sites · CA NV UT AZ NM TX CO
01The Portfolio Ledger
 
Six largest sites · Oct 2026

Built, Building and Permitted

Our six largest sites side by side — including the two still under construction and the one that just won its permit.

Project
Capacity
Storage
Status
Size vs. our largest site
Arden Plains
Texas · hybrid
610 MW
Capacity
610 MW
0.8 GWh
Storage
0.8 GWh
Building · 31%
Status
Building · 31%
 
Kettle Basin
California · solar
510 MW
Capacity
510 MW
—
Storage
—
Building · wk 38
Status
Building · wk 38
 
 
Dunmore Flats
Nevada · solar
420 MW
Capacity
420 MW
—
Storage
—
Operating · 2021
Status
Operating · 2021
 
 
Red Hollow Storage
Texas · storage
400 MW
Capacity
400 MW
1.6 GWh
Storage
1.6 GWh
Operating · 2025
Status
Operating · 2025
 
 
Pinyon Gap
Utah · solar
350 MW
Capacity
350 MW
—
Storage
—
Permitted · 2026
Status
Permitted · 2026
 
 
Saltbush Ridge
Arizona · hybrid
300 MW
Capacity
300 MW
1.2 GWh
Storage
1.2 GWh
Operating · 2023
Status
Operating · 2023
 
 
2.84 GW
Solar operating across the fleet
1.12 GW
Under construction
Why some rows are not sand
Building and permitted sites are listed too — we report the pipeline as it stands, not only what runs.
03Every Project

Browse by Technology

All10
Solar6
Storage2
Hybrid2
Utility-scale solar farm at dusk seen from the air, tracker rows running to the mountains

Dunmore Flats

Nevada · solar · operating since 2021
420 MW
A substation and battery enclosures at dusk

Saltbush Ridge

Arizona · solar + storage · operating since 2023
300 MW + 1.2 GWh
Corvo Mesa tracker rows on a New Mexico mesa

Corvo Mesa

New Mexico · solar · operating since 2022
250 MW
Rows of white battery containers beside a solar farm with technicians on the access road

Red Hollow Storage

Texas · storage · operating since 2025
1.6 GWh
Kettle Basin under construction, a telehandler lifting a pallet of panels

Kettle Basin

California · solar · in construction, COD 2027
510 MW
Aerial view of a hybrid solar and battery plant on the Texas plains at sunset

Arden Plains

Texas · solar + storage · in construction, COD 2027
610 MW + 0.8 GWh
1 2
 
Land · Power · Partnerships

Let’s Build the Next Gigawatt.

Landowners, utilities, corporate buyers and suppliers — tell us about your site or your demand, and the right Terravolt team replies within two working days.

41 sites · seven states
 
Develop · build · own · since 2012
 
Rather Talk It Through?

Speak to the team that runs the plant.

+1-⁠555-⁠0190
Head office · Mon–Fri 8:00–⁠17:30 MST
[email protected]
Landowners & communities
1200 Mesa Verde Blvd, Suite 900
Head office · Sandoval, AZ 85000
[email protected]
Investor relations