Corvo Mesa tracker rows on a New Mexico mesa
Corvo Mesa tracker rows on a New Mexico mesa
 
 
 
Corvo Mesa

Corvo Mesa, Same Rows, Smarter Trackers.

A 250 MW tracker farm on a New Mexico mesa — our first site cleaned entirely by waterless robots, and in 2026 the first to get our new tracker control software.

Valencia County, New Mexico
Operating since 2022
 
2026 Upgrade
Weather-adjusted
+4.6%

Extra output from new tracker control software across all 2,100 rows, with no days offline.

 
 
 
 
 
 
 
 
 
 
 
Project · Solar
 
250 MW · 2,100 rows · robotic dry cleaning
01The Site
 
Operating since 2022

A Dry Mesa and a Thirsty Problem

Why Corvo Mesa uses no wash trucks, and how a software change found 4.6% more power.

01

The Problem

Dust on a high mesa costs output, and washing 2,100 rows with trucks would have used water the county does not have to spare.
02

What We Built

250 MW of single-axis trackers with robotic dry brushes on every row — no wash trucks at all. A 20-year agreement with a corporate buyer took the output before construction began.
03

What Changed

In 2026 we replaced the tracker control software on all 2,100 rows, block by block, without a day offline. Weather-adjusted output rose 4.6%, to about 640 GWh a year.
 
Spec Sheet
Project TV-2020-07
Location
Valencia County, New Mexico
Technology
Single-axis trackers, 2,100 rows
Capacity
250 MWac
Status
Operating since 2022
Offtake
20-year agreement with a corporate buyer
2026 upgrade
Tracker control software, +4.6% output
Water
Robotic dry cleaning, no wash trucks
Annual output
≈640 GWh
02Upgrade Log
 
2,100 rows · 0 days offline

New Software, Zero Days Offline.

The rollout ran block by block in the cool of the morning. Here are the stages, and one rollout day in full.

Stage
Duration
Scope
Result
Feb 2026
Trial on 40 rows
3 weeks
40 rows
+4.9% on trial
Mar 2026
Rollout, blocks A–F
5 weeks
1,260 rows
No downtime
Apr 2026
Rollout, blocks G–K
4 weeks
2,100 rows
Complete
+4.6%
2,100
0 days
Weather-adjusted output
Rows upgraded
Offline
Rollout Day
17 Mar 2026
06:00
Crew briefs at the site base
06:40
Block C trackers stowed flat
07:15
Software pushed to 180 rows
08:05
All rows tracking again
12:00
Block C vs. Block B: +5.1%
15:30
Control room signs the block off
Block C rows upgraded
180 / 180
 
 
 
 
 
 
 
 
03Gallery
 
Photos · Valencia County

Around Corvo

Bifacial rows, the morning tracker check and the robots that keep them clean.

Underside of bifacial solar panels on a single-axis tracker above pale gravel
Bifacial modules catch light from the pale gravel below
Two Terravolt field technicians checking a tracker motor between solar rows
Two Terravolt field technicians checking a tracker motor between solar rows
Tracker motor check · 7:10
A waterless robotic brush cleaning a solar row
A waterless robotic brush cleaning a row of solar panels at golden hour
Dry brush robot · one pass a week
04Output
 
Nov 2025 → Oct 2026

Forecast Against Metered

The plant's revenue meter against the forecast we report on. The gap widens from April, when the new software was on every row.

Monthly output, GWh
 
Forecast · avg 52
 
Metered · avg 54
25
50
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Metered output pulls ahead from April 2026, the first full month on the new tracker software
Forecast
626
GWh · twelve-month forecast
Metered
648
GWh · revenue meter
Difference
+22
GWh · 3.5% over forecast
05In Their Words

Finding Power in the Code

Daniel Okoye, Head of Engineering & Construction, on the 2026 upgrade.

Nothing on the mesa changed that you could see. Same rows, same panels, same robots. We taught 2,100 trackers to read the clouds a little better, and the meter has shown it every month since.

Portrait of Daniel Okoye
Daniel Okoye
Head of Engineering & Construction · Terravolt
+4.6% output
No wash trucks
A substation and battery enclosures at dusk
Previous Project
Saltbush Ridge
Next Project
Red Hollow Storage
Rows of white battery containers beside a solar farm with technicians on the access road
 
Land · Power · Partnerships

Let’s Build the Next Gigawatt.

Landowners, utilities, corporate buyers and suppliers — tell us about your site or your demand, and the right Terravolt team replies within two working days.

41 sites · seven states
 
Develop · build · own · since 2012
 
Rather Talk It Through?

Speak to the team that runs the plant.

+1-555-0190
Head office · Mon–Fri 8:00–17:30 MST
[email protected]
Landowners & communities
1200 Mesa Verde Blvd, Suite 900
Head office · Sandoval, AZ 85000
[email protected]
Investor relations