Rows of white battery containers beside a solar farm
Rows of white battery containers beside a solar farm
 
 
 
Red Hollow Storage

Red Hollow, Four Hours of Evening on Call.

A 400 MW / 1.6 GWh battery at a congested Texas substation. It charges from the midday surplus on the grid and carries about 80,000 homes through the evening peak.

Ector County, Texas
Operating since Mar 2025
 
Availability
Year one
98.4%

Its first full year finished above the 98% availability we committed to the grid operator.

 
 
 
 
 
 
 
 
 
 
 
Project · Storage
 
400 MW / 1.6 GWh · 160 containers
01The Site
 
Operating since Mar 2025

A Battery Where the Grid Was Tight

Why Red Hollow sits at a substation instead of a solar farm, and what it does every evening.

01

The Problem

West Texas makes more power at midday than its lines can carry, then runs short when the sun sets. The substation at Red Hollow was one of the tightest points on the map.
02

What We Built

160 containers of four-hour LFP batteries — 400 MW / 1.6 GWh — beside the substation, with two technicians and a spares store on site.
03

What It Does Now

It charges from the midday surplus and discharges into the evening peak, enough for about 80,000 homes for four hours. Round-trip efficiency is 88%; year-one availability was 98.4%.
 
Spec Sheet
Project TV-2023-01
Location
Ector County, Texas (ERCOT)
Technology
Four-hour LFP battery, 160 containers
Capacity
400 MW / 1.6 GWh
Status
Operating since Mar 2025
Round-trip efficiency
88%
Availability, year one
98.4%
Evening peak
≈80,000 homes for four hours
Site team
Two technicians, spares on site
02Dispatch Log
 
3 calls · 3 answered

When the Grid Called, It Answered.

Three of the evenings the Texas grid leaned on Red Hollow hardest — and the alert night in full.

Evening
Discharge
Charge
Result
24 Aug 2025
Grid conservation appeal
4 h 00 m
100% → 4%
Full output
11 Jan 2026
Winter cold snap
3 h 30 m
96% → 18%
Two peaks
06 Jul 2026
Evening price spike
2 h 15 m
88% → 41%
Online in 1 s
88%
98.4%
≈80k
Round-trip efficiency
Availability, year one
Homes for four hours
Alert Evening
24 Aug 2025
11:30
Charging from the midday surplus
16:10
Grid operator issues a conservation appeal
18:00
Full discharge · 400 MW
20:00
Holding 400 MW · 50% left
22:00
Discharge ends · 4% left
10:30
Recharging from next day's surplus
Charge through the evening
100% → 4%
 
 
 
 
 
 
 
 
03Gallery
 
Photos · Ector County

Around Red Hollow

Inside the enclosures, the control room that dispatches them and the fire crew we trained with.

A technician with a tablet inside a battery storage enclosure aisle
Enclosure aisle · monthly thermal scan
Operators in the Terravolt control room in Sandoval at dusk
Operators in the Terravolt control room in Sandoval at dusk
Dispatch from Sandoval · 18:00
Volunteer firefighters beside a new brush truck
Volunteer firefighters beside a new brush truck at a rural fire station
County fire crew · joint drill before switch-on
04Discharge
 
Nov 2025 → Oct 2026

Evenings Served, Month by Month

Energy delivered back to the grid each month, against the dispatch forecast we report on.

Energy discharged, GWh
 
Forecast · avg 41
 
Discharged · avg 42
20
40
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Summer evenings run the battery hardest — nearly a full cycle every day from June to August
Forecast
490
GWh · dispatch forecast
Discharged
501
GWh · metered at the substation
Difference
+11
GWh · 2.2% over forecast
05In Their Words

Four Hours, Every Evening

Kevin Tran, Head of Energy Markets & Storage, on the alert night.

At four in the afternoon the appeal went out. At six we were at full power and stayed there until ten. The next morning the batteries filled up again from sunshine that would otherwise have been switched off.

Portrait of Kevin Tran
Kevin Tran
Head of Energy Markets & Storage · Terravolt
400 MW for 4 h
Online in 1 s
Corvo Mesa tracker rows on a New Mexico mesa
Previous Project
Corvo Mesa
Next Project
Kettle Basin
Kettle Basin under construction, a telehandler lifting a pallet of panels
 
Land · Power · Partnerships

Let’s Build the Next Gigawatt.

Landowners, utilities, corporate buyers and suppliers — tell us about your site or your demand, and the right Terravolt team replies within two working days.

41 sites · seven states
 
Develop · build · own · since 2012
 
Rather Talk It Through?

Speak to the team that runs the plant.

+1-⁠555-⁠0190
Head office · Mon–Fri 8:00–⁠17:30 MST
[email protected]
Landowners & communities
1200 Mesa Verde Blvd, Suite 900
Head office · Sandoval, AZ 85000
[email protected]
Investor relations