Kettle Basin under construction, a telehandler lifting a pallet of panels
Kettle Basin under construction, a telehandler lifting a pallet of panels
 
 
 
Kettle Basin

Kettle Basin, Rising Block by Block.

Our largest project yet, rising block by block in Kern County. Piling finished in the spring; trackers, modules and the project substation are going in side by side.

Kern County, California
In construction · COD 2027
 
Construction
Weeks on site
38of 70

Union crews on site since January, with about 700 people at peak and commercial operation planned for 2027.

 
 
 
 
 
 
 
 
 
 
 
Project · Solar · building
 
510 MW · Kern County · COD 2027
01The Site
 
Construction · week 38

Half a Gigawatt, Contracted First

What Kettle Basin will be, how it was financed and who is building it.

01

The Plan

510 MW of single-axis trackers on former dryland farms in Kern County, with its own project substation — our largest single plant when it switches on in 2027.
02

How It Was Financed

The output was contracted before construction began. In October 2026 Kettle Basin became part of our $1.3B green project financing, closed with eleven lenders.
03

Who Builds It

Union crews of about 700 at peak, with roughly 60% hired in the county. The same Terravolt team will run the plant from Sandoval for its 35-year life.
 
Spec Sheet
Project TV-2024-03
Location
Kern County, California
Technology
Single-axis trackers
Capacity
510 MWac
Status
Construction, week 38 of 70
Commercial operation
Planned 2027
Offtake
Contracted before construction
Crew
≈700 at peak, union labour
Financing
Part of the $1.3B green financing, Oct 2026
02Build Log
 
On schedule · week 38 of 70

Block by Block, On Schedule.

The milestones so far, and one working day on site this month.

Milestone
Duration
Progress
Status
Jan 2026
Site clearing and roads
6 weeks
100%
Complete
Mar 2026
Piling, 210,000 posts
14 weeks
100%
Complete
Jun 2026
Trackers and modules
28 weeks
46%
On schedule
Aug 2026
Project substation
30 weeks
38%
On schedule
38 of 70
≈700
2027
Weeks on site
Crew at peak, union
Planned operation
Week 38 on Site
15 Oct 2026
05:30
Safety briefing for 640 crew
06:00
Block 14 trackers set out
09:30
11,400 modules fitted today
12:00
Heat pause · 30 min in shade tents
14:00
Substation transformer delivered
17:00
Zero recordable incidents · day 264
Modules fitted to date
46%
 
 
 
 
 
 
 
 
03Gallery
 
Photos · Kern County

Around Kettle Basin

Piling crews, the engineers who walk every block, and the survey that started it.

Pile drivers and a crew installing tracker posts on a solar farm under construction
Piling crew · block 9, April 2026
Two engineers walking between rows of solar trackers at golden hour
Two engineers in hi-vis walking between rows of solar trackers at golden hour
Engineers walk block 12 at golden hour
A surveyor and a drone pilot on open desert land at sunrise
A surveyor with a GPS pole and a colleague launching a drone on open desert land at sunrise
Survey and drone mapping, 2024
04In Their Words

The Biggest Site We Have Built

Daniel Okoye, Head of Engineering & Construction, at week 38.

Seven hundred people at peak, and every one of them goes home the way they came in. We plan the heat into the day, not around it. The schedule matters, but the incident board matters more.

Portrait of Daniel Okoye
Daniel Okoye
Head of Engineering & Construction · Terravolt
510 MW
≈700 crew at peak
Rows of white battery containers beside a solar farm with technicians on the access road
Previous Project
Red Hollow Storage
Next Project
Arden Plains
Aerial view of a hybrid solar and battery plant on the Texas plains at sunset
 
Land · Power · Partnerships

Let’s Build the Next Gigawatt.

Landowners, utilities, corporate buyers and suppliers — tell us about your site or your demand, and the right Terravolt team replies within two working days.

41 sites · seven states
 
Develop · build · own · since 2012
 
Rather Talk It Through?

Speak to the team that runs the plant.

+1-555-0190
Head office · Mon–Fri 8:00–17:30 MST
[email protected]
Landowners & communities
1200 Mesa Verde Blvd, Suite 900
Head office · Sandoval, AZ 85000
[email protected]
Investor relations