Aerial view of solar rows with battery containers and an access road
Aerial view of solar rows with battery containers and an access road
 
 
Projects

Forty-One Sites, One Control Room.

Solar farms, battery storage and hybrid plants across seven Southwest states — developed, built and kept by Terravolt. Every site page shows what it is and what it has done.

7 states
Reported output
 
Operating
Oct 2026
2.84GW

Solar running today, with 3.6 GWh of storage — and 1.12 GW more under construction.

 
 
 
 
 
 
 
 
 
 
 
Projects
 
41 sites · CA NV UT AZ NM TX CO
01The Portfolio Ledger
 
Six largest sites · Oct 2026

Built, Building and Permitted

Our six largest sites side by side — including the two still under construction and the one that just won its permit.

Project
Capacity
Storage
Status
Size vs. our largest site
Arden Plains
Texas · hybrid
610 MW
Capacity
610 MW
0.8 GWh
Storage
0.8 GWh
Building · 31%
Status
Building · 31%
 
Kettle Basin
California · solar
510 MW
Capacity
510 MW
—
Storage
—
Building · wk 38
Status
Building · wk 38
 
 
Dunmore Flats
Nevada · solar
420 MW
Capacity
420 MW
—
Storage
—
Operating · 2021
Status
Operating · 2021
 
 
Red Hollow Storage
Texas · storage
400 MW
Capacity
400 MW
1.6 GWh
Storage
1.6 GWh
Operating · 2025
Status
Operating · 2025
 
 
Pinyon Gap
Utah · solar
350 MW
Capacity
350 MW
—
Storage
—
Permitted · 2026
Status
Permitted · 2026
 
 
Saltbush Ridge
Arizona · hybrid
300 MW
Capacity
300 MW
1.2 GWh
Storage
1.2 GWh
Operating · 2023
Status
Operating · 2023
 
 
2.84 GW
Solar operating across the fleet
1.12 GW
Under construction
Why some rows are not sand
Building and permitted sites are listed too — we report the pipeline as it stands, not only what runs.
03Every Project

Browse by Technology

All10
Solar6
Storage2
Hybrid2
The permitted Pinyon Gap site, open high desert with pinyon pines and a survey stake

Pinyon Gap

Utah · solar · permit granted 2026
350 MW
Juniper Wells solar rows on a snow-dusted Colorado plain

Juniper Wells

Colorado · solar · operating since 2019
180 MW
Aerial view of the Mesquite Draw battery storage site in the New Mexico desert

Mesquite Draw Storage

New Mexico · storage · operating since 2024
600 MWh
Coyote Springs fixed-tilt solar farm in the Arizona desert with a service pickup

Coyote Springs

Arizona · solar · operating since 2017
220 MW
1 2
 
Land · Power · Partnerships

Let’s Build the Next Gigawatt.

Landowners, utilities, corporate buyers and suppliers — tell us about your site or your demand, and the right Terravolt team replies within two working days.

41 sites · seven states
 
Develop · build · own · since 2012
 
Rather Talk It Through?

Speak to the team that runs the plant.

+1-⁠555-⁠0190
Head office · Mon–Fri 8:00–⁠17:30 MST
[email protected]
Landowners & communities
1200 Mesa Verde Blvd, Suite 900
Head office · Sandoval, AZ 85000
[email protected]
Investor relations