Coyote Springs fixed-tilt solar farm in the Arizona desert with a service pickup
Coyote Springs fixed-tilt solar farm in the Arizona desert with a service pickup
 
 
 
Coyote Springs

Coyote Springs, Where Every Technician Starts.

Our first utility-scale plant, switched on in 2017 in Maricopa County — still one of our best performers, and now the training ground for every new Terravolt field technician.

Maricopa County, Arizona
Operating since 2017
 
Annual Output
Metered
≈520GWh

Delivered over the last twelve months under a 25-year agreement with a utility.

 
 
 
 
 
 
 
 
 
 
 
Project · Solar
 
220 MW · first plant · technician academy
01The Site
 
Operating since 2017

The Plant That Started It All

Five years after the company was founded, the first lease became the first plant.

01

The Start

Coyote Springs was the lease that took eleven months to sign. It became our first utility-scale plant in 2017, under a 25-year agreement with a utility.
02

What It Does Now

220 MW of single-axis trackers delivering about 520 GWh a year — still one of the best-performing sites in the fleet, nine years on.
03

What Comes Next

Every new field technician trains here before joining a site team. A repowering study plans a module and inverter refresh for 2031.
 
Spec Sheet
Project TV-2014-01
Location
Maricopa County, Arizona
Technology
Single-axis trackers
Capacity
220 MWac
Status
Operating since 2017
Offtake
25-year agreement with a utility
Repowering study
Module and inverter refresh planned 2031
Annual output
≈520 GWh
Crew training
Our field-technician academy runs here
02Gallery
 
Photos · Maricopa County

Around Coyote Springs

The plant from the air, the robots that keep it clean and the trainees who learn on it.

Top-down aerial view of a solar farm with an inverter station and parked service vans
From the air · inverter station and service road
A waterless robotic brush cleaning a solar row
A waterless robotic brush cleaning a row of solar panels at golden hour
Dry-cleaning robot · retrofitted in 2023
Two technicians inspecting a solar tracker drive
Two technicians inspecting a solar tracker drive with a tablet
Academy trainees on a tracker drive
03Output
 
Nov 2025 → Oct 2026

Nine Years On, Still Ahead

Our oldest plant against its forecast, month by month.

Monthly output, GWh
 
Forecast · avg 42
 
Metered · avg 43
25
50
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Steady all year: the 2023 robot retrofit keeps the rows clean through the dusty spring
Forecast
508
GWh · twelve-month forecast
Metered
518
GWh · revenue meter
Difference
+10
GWh · 2.0% over forecast
04In Their Words

The First Lease Is Still Running

Helen Marsh, CEO, on Coyote Springs.

We spent a year at kitchen tables before anyone said yes. That lease is still running, the plant still beats its forecast, and now every technician we hire learns the job on the same rows.

Portrait of Helen Marsh
Helen Marsh
Chief Executive Officer · Terravolt
First plant · 2017
Technician academy
Aerial view of the Mesquite Draw battery storage site in the New Mexico desert
Previous Project
Mesquite Draw Storage
Next Project
Dunmore Flats
Utility-scale solar farm at dusk seen from the air, tracker rows running to the mountains
 
Land · Power · Partnerships

Let’s Build the Next Gigawatt.

Landowners, utilities, corporate buyers and suppliers — tell us about your site or your demand, and the right Terravolt team replies within two working days.

41 sites · seven states
 
Develop · build · own · since 2012
 
Rather Talk It Through?

Speak to the team that runs the plant.

+1-⁠555-⁠0190
Head office · Mon–Fri 8:00–⁠17:30 MST
[email protected]
Landowners & communities
1200 Mesa Verde Blvd, Suite 900
Head office · Sandoval, AZ 85000
[email protected]
Investor relations