Juniper Wells solar rows on a snow-dusted Colorado plain
Juniper Wells solar rows on a snow-dusted Colorado plain
 
 
 
Juniper Wells

Juniper Wells, a Solar Farm in Bloom.

Our pollinator pilot on the Colorado plains: 180 MW seeded with native wildflowers from day one, where local schools come twice a year to count the bees.

Pueblo County, Colorado
Operating since 2019
 
Ground Cover
Native mix
100%

Of the fenced acres seeded with a native pollinator mix — no bare gravel, no herbicide between the rows.

 
 
 
 
 
 
 
 
 
 
 
Project · Solar
 
180 MW · fixed-tilt + tracker blocks
01The Site
 
Operating since 2019

Rows of Panels, Rows of Flowers

How a mid-size Colorado plant became the template for our land co-use.

01

The Idea

Colorado ranchers asked what would grow under a solar farm. We decided to find out: Juniper Wells was seeded with native wildflowers and grasses before the first panel went in.
02

What We Built

180 MW of fixed-tilt and tracker blocks, contracted for 20 years to a community-choice aggregator that buys power for local towns.
03

What It Does Now

About 410 GWh a year — and a meadow. Twice a year local schools visit to count bees with the site team, and what we learned here now shapes every new site.
 
Spec Sheet
Project TV-2017-05
Location
Pueblo County, Colorado
Technology
Fixed-tilt and tracker blocks
Capacity
180 MWac
Status
Operating since 2019
Offtake
Community-choice aggregator, 20 years
Ground cover
Native pollinator mix on 100% of acres
Annual output
≈410 GWh
School programme
Twice-yearly site visits
02Gallery
 
Photos · Pueblo County

Around Juniper

Winter rows at dusk, the summer meadow and the morning checks in between.

Solar panel rows at dusk under a sand-gold sky with mountains behind
Dusk on the tracker blocks · late autumn
Native wildflowers blooming between rows of solar panels
Native wildflowers blooming between rows of solar panels
June · the native mix in flower between the rows
Two Terravolt field technicians checking a tracker motor between solar rows
Two Terravolt field technicians checking a tracker motor between solar rows
Morning check before the school visit
03Output
 
Nov 2025 → Oct 2026

Forecast Against Metered

Seven years in, the plant still meets its forecast — snow and all.

Monthly output, GWh
 
Forecast · avg 33
 
Metered · avg 34
10
20
30
40
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
December dipped under forecast after two heavy snowfalls; dark panels shed snow within a day
Forecast
400
GWh · twelve-month forecast
Metered
409
GWh · revenue meter
Difference
+9
GWh · 2.3% over forecast
04In Their Words

The Site That Taught Us to Share

Helen Marsh, CEO, on Juniper Wells.

People expected gravel and a fence. We gave them a meadow with panels in it. Every co-use acre we have today — the sheep, the wildflowers, the school visits — started as an experiment here.

Portrait of Helen Marsh
Helen Marsh
Chief Executive Officer · Terravolt
100% native cover
Twice-yearly school visits
The permitted Pinyon Gap site, open high desert with pinyon pines and a survey stake
Previous Project
Pinyon Gap
Next Project
Mesquite Draw Storage
Aerial view of the Mesquite Draw battery storage site in the New Mexico desert
 
Land · Power · Partnerships

Let’s Build the Next Gigawatt.

Landowners, utilities, corporate buyers and suppliers — tell us about your site or your demand, and the right Terravolt team replies within two working days.

41 sites · seven states
 
Develop · build · own · since 2012
 
Rather Talk It Through?

Speak to the team that runs the plant.

+1-555-0190
Head office · Mon–Fri 8:00–17:30 MST
[email protected]
Landowners & communities
1200 Mesa Verde Blvd, Suite 900
Head office · Sandoval, AZ 85000
[email protected]
Investor relations