4 wind farms operating · 201 MW · 2,340 neighbours hold shares
Home / Projects / Calder Ridge
FILE WW-P13 · REV. 10/2026
[ Project WW-01 · Operating ]

Calder Ridge,
our first farm.

Twelve turbines on the Larch County ridge since 2016 — the farm that taught us how to build with neighbours. In 2024 we added a 20 MW battery yard beside the substation.

OPERATING SINCE 2016
LARCH COUNTY
+ BATTERY YARD
PROJECT FILE
WW-01 · REV. 10/26
48MW
12 × 4.0 MW turbines, about 141 GWh in an average wind year.
COMMUNITY SHARE
15% · 610 members
LOCAL FUND
$240,000 / yr
BILL DISCOUNT
540 homes
 
ON THIS PAGE
01   Spec sheet
02   Timeline
03   Output
04   Gallery
01 / Spec sheet

Twelve turbines and a battery yard.

Figures from the as-built drawings and ten years of export-meter data. The 2025 column below is metered, not modelled.

Wind turbines on a misty green ridge at sunrise, with a battery yard beside the access road
WW-01
OPERATING · SINCE 2016
FIG. 01 — Calder Ridge at sunrise, battery yard beside the access road
DRONE SURVEY · 2025
FIG. 01 — Calder Ridge at sunrise, battery yard beside the access road
DRONE SURVEY · 2025
SPEC SHEET · CALDER RIDGE
REV. 10/26
CAPACITY
48 MW
TURBINES
12 × 4.0 MW
YEARLY OUTPUT (P50)
≈ 141 GWh
2025 OUTPUT
140.2 GWh · 99.4% of P50
STORAGE
20 MW / 40 MWh (2024)
COMMUNITY SHARE
15% · 610 members
LOCAL FUND
$240,000 / yr
BILL DISCOUNT
540 homes · $320 / yr
OPERATING SINCE
2016
CHALLENGE
Our first farm, in a valley that had never been asked about wind. Three villages, one school bus route and a ridge in full view of all of them.
OUR RESPONSE
Twelve turbines instead of the sixteen the wind allowed, a 15% community share and the first $5,000-per-megawatt fund in the county.
TEN YEARS ON
Close to forecast over a decade, a fund that has paid every year since 2016, and the base our technicians now run all four farms from.
02 / Timeline

Ten years on the ridge.

From the first drop-in in a school hall to the battery yard that now evens out the evening peak.

2012
 
First drop-in
Larch Valley school hall: 220 people, one wind mast and a lot of questions.
LISTEN
2014
 
Permit granted
Twelve turbines approved with 28 conditions — four fewer than the wind allowed.
PERMIT
2016
 
First power
Twelve turbines turning; the local fund opens its first round.
LIVE
2020
 
O&M base
The technician base moves on site and covers every Westerly farm.
OPERATE
2024
 
Battery yard
20 MW / 40 MWh beside the substation, energised in December.
STORAGE
2025
 
Gearbox exchange
T9’s gearbox replaced in five weeks — the reason 2025 ran under P50.
O&M
10YEARS
Operating since 2016
$2.4M
Local fund paid to date
610MEMBERS
Community shareholders
540HOMES
With the $320 bill discount
03 / Output

Ten years in, still close to forecast.

Wind farms make most of their power in winter. 2025 tracked P50 except May and June, when T9 was stopped for a gearbox exchange.

MONTHLY OUTPUT · 2025 VS P50 · GWh
P50
2025
 
5 GWh
 
10 GWh
 
15 GWh
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
2025 · 99.4% OF P50
T9 STOPPED 5 WEEKS
WINTER PEAK
WHERE IT WENT LOCALLY
2024 VS 2025
LINE
2024
2025
Local fund
$240,000
$240,000
Bill discounts
$169,600
$172,800
O&M wages, local staff
$1.18M
$1.24M
Total
$1.59M
$1.65M
99.4%
OF P50, 2025
97.6%
TURBINE AVAILABILITY
04 / Neighbour voice
“When the fund started, the hall roof leaked and the minibus was older than my kids. Ten rounds later we have both fixed — and the panel that decides is five of us from the valley.”
MT
Marion Tate
LARCH VALLEY HALL COMMITTEE · FUND PANEL 2023–25
FUND ROUNDS
CALDER RIDGE · SINCE 2016
USE
GRANTS
PAID
Halls & buildings
38
$810k
Schools & youth
44
$600k
Transport & access
17
$450k
Energy saving at home
61
$540k
Rounded; every grant is listed in the yearly fund report.
MORE FROM THE REGISTER
Wind measurement mast on open moorland with a parked four-by-four
PREVIOUS · WW-08

Tamsin Flats

Scoping · Owen County · 40 MW
Wind farm substation and battery containers behind a palisade fence
NEXT · WW-01B

Calder Ridge Battery Yard

Operating · Larch County · 40 MWh
Next step / Come and ask

Questions about shares, sound or the fund? Ask the people who build the farms.

FREE · NO BOOKING · A REAL PERSON REPLIES IN TWO WORKING DAYS