Nine turbines at 610 metres above the Owen County dales — our windiest site and our hardest winters. In 2025 it made 5.2% more power than forecast.
Whinfell runs cold-climate turbines with blade heating and ice detection. Figures are metered at the export meter.

The construction season up here is five months long. We planned the whole build around it.
Whinfell matched or beat its monthly P50 in every month of 2025 — even the calm weeks of summer.




