Can Your Roof Take It? A Structural Checklist

Load tables, membrane age and fire setbacks: the six checks we run before any layout.
Agricultural building with a rooftop solar array among fields

No price leaves our office until a structural engineer has looked at the roof. These are the six checks we run in the first ten days of every feasibility study — and the questions you can ask any installer before you sign.

1. Spare load capacity

A ballasted array adds 12 to 25 kg per square metre. We read the original drawings, check the purlin and deck ratings and calculate the reserve for snow, wind uplift and the new dead load together.

2. Membrane age and warranty

If a TPO or bitumen membrane has fewer than ten years left, replace it before the array goes on. Lifting 2,000 modules to re-roof later costs more than doing both now. We also confirm the membrane manufacturer allows ballast trays without voiding its warranty.

3. Fire setbacks and access

Local codes require clear paths around the roof edge, around skylights and between array blocks. They shape the layout more than most people expect, often removing 8 to 15% of the usable area.

4. Wind zones

Corners and edges see the highest uplift. We model them separately and add ballast or mechanical attachment only where the numbers demand it.

5. Drainage

Rails and trays must never dam water. Our layouts follow the falls and keep drains and scuppers clear.

6. Plant and future plans

HVAC units, smoke vents and planned expansions all need space. A roof that will host a new chiller in three years should keep that area free today.

If a roof fails one of these checks, it does not mean solar is off the table. It usually means a carport or a ground-mount field is the better option for that site.

Written By

Head of Engineering
Head of Engineering. Owen has signed off the electrical design of 140+ Northbeam sites and leads the storage team in Ashford. Before solar he designed substations for a Texas utility.
All notes by Owen Reyes, PE
Keep reading

Three notes that pair with this one.

All Insights
Next step · Feasibility study

Send 12 months of bills. Get three priced options in 10 working days.

No fee, no obligation — an engineer replies in one working day.

Request a Feasibility Study
Direct lines

Talk to an engineer, not a call centre.

Sales desk · +1-555-0188[email protected]O&M desk · 24 / 7 / 365