FLEET STATUS · 338 / 340 sites online · uptime 99.6% (2025)
Mon–Fri 7:00–18:00 CT     Careers     Client Portal
SALES DESK
+1-555-0188
HEAD OFFICE
1180 Meridian Pkwy, Ashford TX
FEASIBILITY
10-day desk study, no fee

Demand Charges: Where Storage Earns Its Keep

Why one 15-minute spike can cost more than a month of energy — and how a battery clips it.
Solar canopy with EV charging cabinets over a car park

Most facilities teams read the energy line on their bill. The line that hurts is the one underneath it — a charge set by the single busiest 15 minutes of the month, whether it happened once or every day.

The demand line on your bill

On a commercial tariff you pay twice: once for every kWh you use, and once for the highest rate at which you used it. The utility meters your load in 15-minute blocks, takes the worst block of the month and multiplies it by a demand rate.

At Harbor Logistics that rate is $15.50 per kW. In August 2024 the cold docks, chargers and HVAC overlapped on a hot Tuesday afternoon and set a 1,840 kW peak. That one quarter-hour cost $28,600 — more than 30% of the month’s bill.

$15.50 / kW

Demand rate on the Ashford commercial tariff, per month

1,840 kW

Highest 15-minute average in August 2024

$28,600

Demand charge for that one month

Why solar alone barely touches it

A roof array is excellent at the energy line. It is unreliable at the demand line, because the demand charge only needs one cloudy quarter-hour — or one late-afternoon spike after the panels fade — to reset the peak.

Technician checking a rooftop inverter with a tablet at the Harbor Logistics site
Fig. 02 — Reading inverter output against the site meter. Solar fell to 18% of rated power by 17:15, the exact block that set the new peak.

In our first model, solar alone cut Harbor’s August peak by just 9%. The busiest block simply moved from 14:00 to 17:15. The energy saving was real; the demand saving was almost nothing.

“Solar lowers how much you buy. Storage lowers how fast you buy it. The demand charge only cares about the second.”

Owen Reyes · Head of Engineering

Sizing the battery to the shoulder

The battery does not need to run the building. It needs to cover the gap between what the grid should supply and what the site wants — only during the shoulder, only on the worst days.

Three numbers we pull from interval data

  • The shoulder peak. Your highest 15-minute reading after solar output starts to fall — usually 16:00 to 20:00.
  • Its duration. How many hours that shoulder lasts on the worst weekday of the month. That sets the kWh.
  • The ratchet. Some tariffs bill 80% of your annual peak for eleven months. One bad day then costs you a year.
BatteryPeak shavedSaved / monthPayback
250 kWh / 125 kW125 kW$1,9408.9 yrs
500 kWh / 250 kW230 kW$3,5706.4 yrs
1 MWh / 500 kW290 kW$4,5009.6 yrs
Table 01 — Battery options, Harbor Logistics, at $15.50 / kW and 2025 prices. Highlighted row = installed. The 1 MWh option runs out of energy before the shoulder ends, so the extra kWh barely move the peak.

The payback maths

The 500 kWh battery shaves about 230 kW from the shoulder peak, worth $3,570 a month at $15.50 per kW. It also shifts midday solar into the evening, which adds roughly $9,000 a year on the energy line. Against an installed cost of $340,000, simple payback lands at 6.4 years.

Inside a PPA the client never sees that payback — it is priced into the rate. Owning the battery outright makes sense when the tariff has a ratchet; leasing makes sense when it does not.

Run it on your own bill. We will send the worked model with Harbor’s data swapped for yours — send us 12 months of interval data.

Written By

Head of Engineering
Head of Engineering. Owen has signed off the electrical design of 140+ Northbeam sites and leads the storage team in Ashford. Before solar he designed substations for a Texas utility.
All notes by Owen Reyes, PE
Keep reading

Three notes that pair with this one.

All Insights
3 comments
    1. Owen Reyes, PEAuthor

      Both. With a ratchet we size for the worst day of the year, not the month, so the kWh usually goes up by 20–30%. Payback improves because every avoided kW is saved twelve times. Send us the interval data and we’ll run it.

Leave a comment

Next step · Feasibility study

Send 12 months of bills. Get three priced options in 10 working days.

No fee, no obligation — an engineer replies in one working day.

Request a Feasibility Study
Direct lines

Talk to an engineer, not a call centre.

Sales desk · +1-555-0188[email protected]O&M desk · 24 / 7 / 365