Kestrel Foods: Running a Packhouse Through Harvest on Solar

Cold rooms peak exactly when the sun does. How 640 kWp and 1 MWh carried the season.
Installation crew mounting solar modules on a commercial roof

Kestrel Foods packs fruit near Waco, Texas. Harvest runs from June to September, when cold rooms work hardest and afternoon temperatures pass 38 °C. It is a near-perfect match for solar.

The system

We installed 640 kWp on the packhouse roof and a 1 MWh battery beside the cold store in 2024. The array covers most daytime load; the battery takes over through the evening packing shift and shaves the demand peak when the blast chillers start.

Harvest 2025 in numbers

  • Solar share of daytime load: 74%
  • Peak demand reduced from 910 kW to 610 kW
  • Yield against P50: 103.4%
  • Unplanned downtime: none

What we would do again

Sizing the battery for the evening shift rather than for backup gave the best return. The client also added a refrigerated trailer bay to the plan, and the conduit we left in place made it a one-day job.

Written By

Head of Engineering
Head of Engineering. Owen has signed off the electrical design of 140+ Northbeam sites and leads the storage team in Ashford. Before solar he designed substations for a Texas utility.
All notes by Owen Reyes, PE
Keep reading

Three notes that pair with this one.

All Insights
Next step · Feasibility study

Send 12 months of bills. Get three priced options in 10 working days.

No fee, no obligation — an engineer replies in one working day.

Request a Feasibility Study
Direct lines

Talk to an engineer, not a call centre.

Sales desk · +1-555-0188[email protected]O&M desk · 24 / 7 / 365