Home / Projects / Brightline DC
DOC NB-P13 · REV. 10/2026
[ Project NB-0318 · Logistics ]

Brightline Distribution
clipped the dawn peak.

A regional distribution centre whose electric delivery vans all charge before the morning routes. We built a 520 kWp array on its standing-seam roof without a single penetration, plus a 400 kWh battery that takes the early charging peak.

LOGISTICS
AURORA, CO
ENERGISED MAY 2023
PROJECT FILE
NB-0318 · REV. B
520kWp
Standing-seam rooftop array plus a 400 kWh battery for the morning charging peak.
CLIENT
Brightline Distribution
MODEL
Owned · capex
YIELD VS P50
102.1%
 
ON THIS PAGE
01   Spec sheet
02   Demand profile
03   Timeline
04   Gallery
01 / Spec sheet

Not one hole in a warrantied roof.

As-built figures and the first twelve months of meter and battery data. The clamp detail was approved by the roof manufacturer before a single module arrived.

Installation crew mounting solar modules on a commercial roof
NB-0318
AS-BUILT · MAY 2023
FIG. 01 — Module lift onto the standing-seam roof
SITE PHOTO · APR 2023
FIG. 01 — Module lift onto the standing-seam roof
SITE PHOTO · APR 2023
SPEC SHEET · BRIGHTLINE
REV. B
SITE
Aurora, CO · distribution centre
ROOF
Metal standing seam · R-1
MOUNTING
Rail-free seam clamps, no penetrations
CAPACITY (DC / AC)
520 kWp / 500 kW
MODULES
1,240 × 420 W mono
STORAGE
400 kWh / 200 kW LFP
ANNUAL YIELD
764 MWh P50 · 780 yr 1
PEAK DEMAND
1,080 → 800 kW
CO₂ AVOIDED
304 t / year
ROOF WARRANTY
Intact, manufacturer-approved
COMMERCIAL MODEL
Owned (capex)
CHALLENGE
Electric vans charging from 03:00 set a 1,080 kW peak at dawn, before any panel could help — and the roof manufacturer would void the warranty for a single fixing through the seams.
ENGINEERING RESPONSE
Rail-free clamps on the standing seams, approved by the manufacturer, and a 400 kWh battery that charges from the array at midday and discharges between 04:00 and 08:00.
RESULT
Peak demand down 26%, yield at 102.1% of P50, the roof warranty intact, and every kWh owned outright by the client.
02 / Demand profile

The van-charging peak, before and after.

The worst quarter-hour of the day comes before sunrise, when the whole fleet is plugged in. The battery covers it from solar stored the afternoon before. Same June weekday, 2022 versus 2023.

GRID IMPORT · TYPICAL JUNE WEEKDAY · kW
BEFORE
AFTER
 
250 kW
 
500 kW
 
750 kW
 
1,000 kW
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
00:00
02:00
04:00
06:00
08:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
00
02
04
06
08
10
12
14
16
18
20
22
PEAK 1,080 → 800 kW
BATTERY 04:00–08:00
VANS CHARGE FROM 03:00
JUNE BILL
2022 VS 2023
LINE
BEFORE
AFTER
Energy charges
$49,700
$38,900
Demand charges
$17,280
$12,800
Fixed & riders
$2,300
$2,300
Total
$69,280
$54,000
−26%
PEAK DEMAND
−22%
JUNE BILL
03 / Timeline

Nine months, nine weeks of them on the roof.

The longest single task was not the build but the clamp approval: the roof manufacturer tested our detail on a sample panel before signing.

AUG 2022
 
Feasibility study
Interval data, the van charging log and three priced options.
PHASE 01
OCT 2022
 
Capex approved
Owner-funded; the manufacturer signed off the clamp detail the same month.
PHASE 02
JAN 2023
 
Utility approval
Interconnection approved with the battery set to zero export.
PHASE 03
MAR 2023
 
Mobilised
Clamps and modules in six weeks; battery set on the dock apron.
PHASE 04
MAY 2023
 
Energised
Witnessed by the utility, nine weeks after mobilisation.
LIVE
MAY 2024
 
Year-one report
Yield at 102.1% of P50, peak demand down 26%, no roof leaks.
O&M
0HOLES
Penetrations through the roof
9WEEKS
Mobilisation to energised
−280kW
Dawn charging peak
0LTI
Lost-time incidents
05 / Client voice
“Our vans all plug in before dawn, so we assumed solar could not touch our worst number. The battery proved us wrong — and our roofer still honours the warranty.”
TO
Teresa Okafor
GENERAL MANAGER · BRIGHTLINE DISTRIBUTION
YEAR ONE VS MODEL
MAY 2024
METRIC
MODEL
ACTUAL
Annual yield
764
780 MWh
Dawn peak
850 kW
800 kW
Availability
99.0%
99.6%
Roof leaks
0
0
Weather-corrected revenue-meter and battery-controller data, May 2023 – May 2024.
MORE FROM THE REGISTER
Agricultural building with a rooftop solar array among fields
PREVIOUS · NB-0302

Marlow Orchard Barn

Agri & Food · 96 kWp
Close-up of solar module rails and clamps on a membrane roof
NEXT · NB-0329

Monoline Retail Park

Retail · 880 kWp
Next step / Feasibility study

Send 12 months of bills. Get three priced options in 10 working days.

NO FEE · NO OBLIGATION · AN ENGINEER REPLIES IN ONE WORKING DAY
DIRECT LINES
SALES DESK
+1-555-0188
O&M DESK
24 / 7 / 365