A retail park with long opening hours and a car park that baked in the sun. The landlord funded an 880 kWp rooftop and canopy plant itself; the tenants buy its power under 15-year agreements at a fixed rate.
As-built drawings and the first year of site-meter data. Tenant shares are read from sub-meters every fifteen minutes and billed at the agreed fixed rate.

Retail load climbs with the doors at 08:00 and the HVAC through the afternoon — almost the same curve as the plant. Same July weekday, 2023 before energisation versus 2024.
Canopy permits need zoning as well as building approval. On site the steel went up a row at a time, so shoppers never lost more than thirty bays.