Home / Projects / Monoline Retail
DOC NB-P13 · REV. 10/2026
[ Project NB-0329 · Retail ]

Monoline Retail Park
became its tenants’ utility.

A retail park with long opening hours and a car park that baked in the sun. The landlord funded an 880 kWp rooftop and canopy plant itself; the tenants buy its power under 15-year agreements at a fixed rate.

RETAIL
PLANO, TX
ENERGISED SEP 2023
PROJECT FILE
NB-0329 · REV. C
880kWp
Anchor roofs plus 212 canopy bays; the landlord owns it, the tenants buy the power.
CLIENT
Monoline Properties
MODEL
Owner-funded · tenant PPAs
CANOPY
212 bays · 24 chargers
 
ON THIS PAGE
01   Spec sheet
02   Demand profile
03   Timeline
04   Gallery
01 / Spec sheet

Anchor roofs above, 212 shaded bays below.

As-built drawings and the first year of site-meter data. Tenant shares are read from sub-meters every fifteen minutes and billed at the agreed fixed rate.

Close-up of solar module rails and clamps on a membrane roof
NB-0329
AS-BUILT · SEP 2023
FIG. 01 — Ballasted rails on an anchor-store roof
SITE PHOTO · OCT 2023
FIG. 01 — Ballasted rails on an anchor-store roof
SITE PHOTO · OCT 2023
SPEC SHEET · MONOLINE RETAIL PARK
REV. C
SITE
Plano, TX · retail park + car park
ROOFTOP
320 kWp · TPO, three anchor units
CARPORT
560 kWp · 212 bays, double cantilever
CAPACITY (DC / AC)
880 kWp / 800 kW
MODULES
2,000 × 440 W mono
EV CHARGING
24 chargers under the canopy
ANNUAL YIELD
1,227 MWh P50 · 1,236 yr 1
CO₂ AVOIDED
482 t / year
OWNERSHIP
Landlord-funded (capex)
TENANT SUPPLY
15-yr PPAs, fixed rate
YIELD VS P50
100.7%
CHALLENGE
Long opening hours, heavy HVAC and a 1,350 kW summer peak across a dozen tenants on one site meter — plus a car park shoppers avoided at midday because their cars came back too hot to touch.
ENGINEERING RESPONSE
The landlord funded the plant: 320 kWp on the anchor roofs and double-cantilever canopies over 212 bays with 24 chargers. Tenants buy the output under 15-year agreements.
RESULT
Yield at 100.7% of P50, peak demand down 19%, shaded parking all summer and a power price every tenant can put in its budget for fifteen years.
02 / Demand profile

Opening hours meet solar hours.

Retail load climbs with the doors at 08:00 and the HVAC through the afternoon — almost the same curve as the plant. Same July weekday, 2023 before energisation versus 2024.

GRID IMPORT · SITE METER · JULY WEEKDAY · kW
BEFORE
AFTER
 
400 kW
 
800 kW
 
1,200 kW
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
00:00
02:00
04:00
06:00
08:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
00
02
04
06
08
10
12
14
16
18
20
22
PEAK 1,350 → 1,100 kW
DOORS 08:00–22:00
SOLAR 07:00–19:00
JULY BILL · SITE
2023 VS 2024
LINE
BEFORE
AFTER
Grid energy
$64,200
$47,200
Demand charges
$20,250
$16,500
Solar, tenant PPAs
—
$13,000
Total
$84,450
$76,700
−19%
PEAK DEMAND
212
BAYS UNDER CANOPY
03 / Timeline

Ten months, and the car park stayed open.

Canopy permits need zoning as well as building approval. On site the steel went up a row at a time, so shoppers never lost more than thirty bays.

NOV 2022
 
Feasibility study
Site and tenant sub-meter data, a car-park survey and three priced options.
PHASE 01
JAN 2023
 
Capex approved
Landlord-funded; tenant power agreements drafted alongside the build contract.
PHASE 02
MAR 2023
 
Permits
Building and zoning approval for the canopies, utility sign-off for the site meter.
PHASE 03
JUN 2023
 
Mobilised
Canopies a row at a time; roof work after closing.
PHASE 04
SEP 2023
 
Energised
Witness test passed and the 24 chargers live.
LIVE
SEP 2024
 
Year-one report
Yield at 100.7% of P50, peak demand down 19%, availability 99.5%.
O&M
212BAYS
Shaded, never more than 30 closed
24CHARGERS
Under the canopy
13WEEKS
Mobilisation to energised
0LTI
Lost-time incidents
MORE FROM THE REGISTER
Installation crew mounting solar modules on a commercial roof
PREVIOUS · NB-0318

Brightline Distribution

Logistics · 520 kWp
Northbeam head office building in Ashford
NEXT · NB-0344

Caldwell Community College

Campuses · 740 kWp
Next step / Feasibility study

Send 12 months of bills. Get three priced options in 10 working days.

NO FEE · NO OBLIGATION · AN ENGINEER REPLIES IN ONE WORKING DAY
DIRECT LINES
SALES DESK
+1-555-0188
O&M DESK
24 / 7 / 365