Four teaching buildings and a student car park, built only while classes were out. Two roofs a summer, then the carport — one 740 kWp plant on one meter, leased by the college with operations and maintenance included.
As-built drawings for all three build packages and the first full year of metered data after the plant was complete.

Each package went live as soon as its summer ended. The carport waited one winter for the utility’s new transformer, which completed the plant.




