Orbis Medical Campus,
four hours in reserve.

Two hospital wings and four clinics on one campus meter plan. We put 1.5 MWp on the six roofs, 0.6 MWp of trackers on the old overflow lot and 2 MWh of storage behind the essential board — the solar on a 15-year PPA, the battery on a 12-year lease.

HEALTHCARE
DENVER, CO
ENERGISED JUN 2024
PROJECT FILE
NB-0351 · REV. D
2.1MWp
Six roofs and a tracker field on one meter plan, with 2 MWh behind the essential board.
CLIENT
Orbis Health
MODEL
15-yr PPA + 12-yr lease
BACKUP
Essential board, 4 h
 
ON THIS PAGE
01   Spec sheet
02   Demand profile
03   Timeline
04   Gallery
01 / Spec sheet

Six roofs, one field, one essential board.

As-built figures and the first year of metered data. Backup capacity is tested every quarter with the hospital’s engineers watching, not just modelled.

Technician flying an inspection drone over a rooftop solar array
NB-0351
AS-BUILT · JUN 2024
FIG. 01 — Thermal drone survey over the clinic roofs
IR SURVEY · DEC 2024
FIG. 01 — Thermal drone survey over the clinic roofs
IR SURVEY · DEC 2024
SPEC SHEET · ORBIS MEDICAL CAMPUS
REV. D
SITE
Denver, CO · 6 buildings, one meter plan
ROOFS
Concrete deck + membrane · R-3 / R-2
ROOFTOP ARRAYS
1.5 MWp on six roofs
TRACKER FIELD
0.6 MWp single-axis, overflow lot
CAPACITY (DC)
2.1 MWp
STORAGE
2 MWh / 500 kW LFP · UL 9540
BACKUP
Essential board, 4 h
ANNUAL YIELD
3,243 MWh P50 · 3,256 yr 1
CO₂ AVOIDED
1,270 t / year
COMMERCIAL MODEL
15-yr PPA (solar) · 12-yr lease (battery)
THERMAL SURVEYS
Drone, twice a year
CHALLENGE
A 24/7 critical load with a 2,400 kW midday peak, six buildings of different ages and roof types, and a board that would accept no risk at all to the essential circuits.
ENGINEERING RESPONSE
Arrays on every roof the structure allowed, a small tracker field where it did not, and a 2 MWh battery that clips the afternoon peak but always holds four hours for the essential board.
RESULT
Peak demand down 29%, year-one yield at 100.4% of P50, and two grid outages in the first year ridden through without the essential board dropping.
02 / Demand profile

A hospital never sleeps; its peak can.

The night base stays near 70% of the peak, so solar works the middle of the day and the battery clips the late afternoon — while keeping its backup reserve untouched. Same May weekday, 2024 versus 2025.

GRID IMPORT · TYPICAL MAY WEEKDAY · kW
BEFORE
AFTER
 
500 kW
 
1,000 kW
 
1,500 kW
 
2,000 kW
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
00:00
02:00
04:00
06:00
08:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
00
02
04
06
08
10
12
14
16
18
20
22
PEAK 2,400 → 1,700 kW
BATTERY 16:00–20:00
4 H BACKUP HELD
MAY BILL
2024 VS 2025
LINE
BEFORE
AFTER
Grid energy
$139,200
$96,500
Demand charges
$38,400
$27,200
PPA + battery lease
—
$41,200
Total
$177,600
$164,900
−29%
PEAK DEMAND
4 h
ESSENTIAL-BOARD BACKUP
03 / Timeline

Fifteen months, built around patients.

Most of the work happened on occupied buildings: lifts at night over the hospital wings, quiet tools near the wards and a fire-code review for the battery room.

MAR 2023
 
Feasibility study
Interval data for six meters, roof cores on every building, the outage log.
PHASE 01
JUN 2023
 
Contracts signed
15-year PPA for the solar, 12-year lease for the battery, one O&M contract.
PHASE 02
OCT 2023
 
Grid & fire review
Utility study for the meter plan and a fire-code review of the battery room.
PHASE 03
FEB 2024
 
Mobilised
Roof by roof around patient areas, night lifts over the two wings.
PHASE 04
JUN 2024
 
Energised
Witness test passed and the first backup test run with the hospital team.
LIVE
JUN 2025
 
Year-one report
Yield at 100.4% of P50; two drone surveys found three hot spots, all fixed in a week.
O&M
6ROOFS
Built around patient areas
4H
Backup held for the essential board
2× / YR
Thermal drone surveys
0LTI
Lost-time incidents
05 / Client voice
“The battery was the part our board cared about. Twice in the first year the grid dropped and the essential board never blinked — and the solar has cut the bill every month since it went live.”
GW
Grant Whitaker
DIRECTOR OF FACILITIES · ORBIS HEALTH
YEAR ONE VS MODEL
JUN 2025
METRIC
MODEL
ACTUAL
Annual yield
3,243
3,256 MWh
Peak demand
1,800 kW
1,700 kW
Outages ridden through
—
2
Availability
99.0%
99.5%
Weather-corrected. Backup tests witnessed by the hospital’s engineering team every quarter.
MORE FROM THE REGISTER
Northbeam head office building in Ashford
PREVIOUS · NB-0344

Caldwell Community College

Campuses · 740 kWp
Ground-mounted solar rows beside a gravel service road
NEXT · NB-0365

Teller Precision Plant

Manufacturing · 1.6 MWp
Next step / Feasibility study

Send 12 months of bills. Get three priced options in 10 working days.

NO FEE · NO OBLIGATION · AN ENGINEER REPLIES IN ONE WORKING DAY