Teller Precision
put its spare land to work.

A two-shift machining plant with 2.6 hectares of empty land beside the factory. We built a 1.6 MWp single-axis tracker field and tied it in at medium voltage — behind the meter, with every kWh bought under a 20-year PPA.

MANUFACTURING
TULSA, OK
ENERGISED AUG 2024
PROJECT FILE
NB-0365 · REV. C
1.6MWp
Single-axis tracker field on spare land, connected at medium voltage.
CLIENT
Teller Precision
MODEL
20-yr PPA
YIELD VS P50
100.9%
 
ON THIS PAGE
01   Spec sheet
02   Demand profile
03   Timeline
04   Gallery
01 / Spec sheet

Trackers on the lot nobody used.

As-built drawings and the first twelve months of revenue-meter data. The tracker gain is measured against a fixed-tilt reference string on the same site.

Ground-mounted solar rows beside a gravel service road
NB-0365
AS-BUILT · AUG 2024
FIG. 01 — Tracker rows and the service road beside the plant
DRONE SURVEY · SEP 2024
FIG. 01 — Tracker rows and the service road beside the plant
DRONE SURVEY · SEP 2024
SPEC SHEET · TELLER PRECISION
REV. C
SITE
Tulsa, OK · 2.6 ha beside the plant
SYSTEM
Single-axis trackers, ±55°
CAPACITY (DC / AC)
1.6 MWp / 1.25 MW
MODULES
3,640 × 440 W bifacial
INVERTER
1.25 MW skid · 1,500 kVA transformer
CONNECTION
Medium voltage, behind the meter
TRACKER GAIN
+18% vs fixed tilt
ANNUAL YIELD
2,800 MWh P50 · 2,825 yr 1
CO₂ AVOIDED
1,102 t / year
COMMERCIAL MODEL
20-yr PPA
PILING TO ENERGISED
13 weeks
CHALLENGE
Two shifts from 06:00 to 22:00 and a 2,600 kW daytime peak. The factory roof was an old steel deck with no spare load capacity, but the lot beside it had stood empty for a decade.
ENGINEERING RESPONSE
A single-axis tracker field on the empty lot, bifacial modules, one inverter skid and a medium-voltage tie-in to the plant’s own transformer — so every kWh offsets grid power.
RESULT
Peak demand down 25%, trackers yielding 18% more than fixed tilt would have, and year-one output at 100.9% of P50 with nothing paid up front.
02 / Demand profile

Trackers follow the shift, not just the sun.

A tracker field keeps producing late into the afternoon, when the second shift is at full load. Same July weekday, 2024 before energisation versus 2025.

GRID IMPORT · TYPICAL JULY WEEKDAY · kW
BEFORE
AFTER
 
500 kW
 
1,500 kW
 
2,500 kW
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
00:00
02:00
04:00
06:00
08:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
00
02
04
06
08
10
12
14
16
18
20
22
PEAK 2,600 → 1,950 kW
SHIFTS 06:00–22:00
TRACKING 06:00–19:00
JULY BILL
2024 VS 2025
LINE
BEFORE
AFTER
Grid energy
$112,400
$84,000
Demand charges
$33,800
$25,350
Solar PPA power
—
$22,800
Total
$146,200
$132,150
−25%
PEAK DEMAND
+18%
TRACKER GAIN VS FIXED TILT
03 / Timeline

Eleven months, most of them in permits.

A ground-mount needs a land-use permit and a grid study, so the paperwork ran longer than the build. On site, piling to energised took thirteen weeks.

SEP 2023
 
Feasibility study
Interval data, a land survey and fixed-tilt versus trackers priced side by side.
PHASE 01
NOV 2023
 
PPA signed
Twenty years, yield guaranteed at 95% of P90.
PHASE 02
MAR 2024
 
Land use & grid
Land-use approval and the utility study for the MV tie-in.
PHASE 03
MAY 2024
 
Mobilised
Piling, tracker assembly and trenching to the plant substation.
PHASE 04
AUG 2024
 
Energised
Witness test at medium voltage, thirteen weeks after the first pile.
LIVE
AUG 2025
 
Year-one report
Yield at 100.9% of P50, availability 99.4%, peak demand down 25%.
O&M
13WEEKS
Piling to energised
2.6HA
Former empty lot
+18%
Yield over fixed tilt
0LTI
Lost-time incidents
MORE FROM THE REGISTER
Technician flying an inspection drone over a rooftop solar array
PREVIOUS · NB-0351

Orbis Medical Campus

Healthcare · 2.1 MWp
Aerial view of a logistics warehouse with a rooftop solar array and loading docks
NEXT · NB-0377

Kestrel Foods Packhouse

Agri & Food · 640 kWp
Next step / Feasibility study

Send 12 months of bills. Get three priced options in 10 working days.

NO FEE · NO OBLIGATION · AN ENGINEER REPLIES IN ONE WORKING DAY
DIRECT LINES
SALES DESK
+1-555-0188
O&M DESK
24 / 7 / 365