A 26,000 m² distribution centre with cold docks running around the clock. We designed, built and now operate a 1.2 MWp roof array with 500 kWh of storage — on a 15-year PPA, with no capital from the client.
Every figure below comes from the as-built drawings and the first twelve months of revenue-meter data. Nothing is modelled unless it says so.

Solar flattens the middle of the day; the battery takes the 16:00–20:00 shoulder when the docks are busiest and the sun is low. Same weekday, August 2024 versus August 2025.
Most of the calendar was paperwork: the utility study and the PPA. On the roof itself, one crew worked eleven weeks around live loading docks.