FLEET STATUS · 338 / 340 sites online · uptime 99.6% (2025)
Mon–Fri 7:00–18:00 CT     Careers     Client Portal
SALES DESK
+1-555-0188
HEAD OFFICE
1180 Meridian Pkwy, Ashford TX
FEASIBILITY
10-day desk study, no fee
Home / Projects / Tamsin Cold Chain
DOC NB-P13 · REV. 10/2026
[ Project NB-0431 · Logistics · In build ]

Tamsin Cold Chain
week 21 of 26.

A temperature-controlled distribution hub under a 31,000 m² TPO roof. Our crews are installing a 1.6 MWp array on a 20-year PPA, on programme for energisation in Q4 2026 — and this page follows the same Friday report the client reads.

LOGISTICS
FORT HALE, TX
IN BUILD · WEEK 21
PROJECT FILE
NB-0431 · REV. B
1.6MWp
Rooftop array on a 31,000 m² TPO roof, in build: phase 04, on track.
CLIENT
Tamsin Cold Chain
MODEL
20-yr PPA
ENERGISATION
Planned Q4 2026
 
ON THIS PAGE
01   Spec sheet
02   Demand profile
03   Timeline
04   Gallery
01 / Spec sheet

One cold-chain roof, signed to IFC.

These figures come from the issued-for-construction drawings and the signed yield model. Year-one numbers replace them twelve months after energisation.

Warehouse interior with racking, a forklift and pallets of solar modules
NB-0431
IN BUILD · WEEK 21
FIG. 01 — Module pallets staged for the lift to roof zone C
SITE PHOTO · OCT 2026
FIG. 01 — Module pallets staged for the lift to roof zone C
SITE PHOTO · OCT 2026
SPEC SHEET · TAMSIN COLD CHAIN
REV. B
SITE
Fort Hale, TX · 31,000 m² roof
ROOF
TPO membrane · R-2
CAPACITY (DC / AC)
1.6 MWp / 1.32 MW
MODULES
3,900 × 410 W mono
STRINGS
300 × 13 modules
INVERTERS
12 × 110 kW string
MOUNTING
East-west ballast, 10°
YIELD MODEL
2,290 MWh / yr at P50
COMMERCIAL MODEL
20-yr PPA
STATUS
In build · week 21 / 26
ENERGISATION
Planned Q4 2026
CHALLENGE
Two cold rooms and forty dock doors run around the clock, so most of the load sits at night when no array can help. The roof was sound but rated for light ballast only near the parapets.
ENGINEERING RESPONSE
We sized the array to the daytime shoulder rather than the peak, kept the heavier trays out of the edge zones and lift every pallet from the yard side, so no dock door closes.
STATUS · WEEK 21
Phase 04 is 62% complete with 186 of 300 strings installed. No incidents so far, two open RFIs, and inverter setting plus DC testing next week.
02 / Demand profile

What the model expects in August.

A cold store never really switches off: the night base sits near 60% of the peak. Grey is metered 2025 import; indigo is the signed model with the array running. We will publish the measured version after the first summer.

GRID IMPORT · AUGUST WEEKDAY · kW · 2025 VS MODEL
BEFORE
AFTER
 
500 kW
 
1,000 kW
 
1,500 kW
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
00:00
02:00
04:00
06:00
08:00
10:00
12:00
14:00
16:00
18:00
20:00
22:00
00
02
04
06
08
10
12
14
16
18
20
22
PEAK 2,100 → 1,600 kW (MODEL)
SOLAR 07:00–18:00
NIGHT BASE ≈ 60%
AUGUST BILL · MODEL
2025 VS MODEL
LINE
2025
MODEL
Grid energy
$106,100
$78,500
Demand charges
$31,500
$24,000
Solar PPA power
—
$21,600
Total
$137,600
$124,100
−24%
PEAK IMPORT · MODEL
26%
AUGUST LOAD FROM SOLAR · MODEL
03 / Timeline

Twenty-six weeks from contract to energised.

The standard programme from How We Deliver, with real dates. The interconnection application went in at week six, while design was still running.

MAR 2026
 
Feasibility study
Interval data for both cold rooms, a roof desk check and three priced options in ten working days.
PHASE 01
MAY 2026
 
PPA signed
Week 0: a 20-year agreement with the yield guaranteed at 95% of P90.
CONTRACT
JUN 2026
 
Design & IFC
Survey days, core samples and the stamped structural letter; utility application filed at week 6.
PHASE 02
SEP 2026
 
Mobilised
Week 18: ballast trays first, then modules, lifted from the yard side only.
PHASE 04
OCT 2026
 
Week 21
186 of 300 strings in; inverter set and DC testing next week.
IN BUILD
Q4 2026
 
Energisation
Utility witness test, then seven days of live monitoring before gate G4.
PLANNED
186/ 300
Strings installed at week 21
62%
Phase 04 complete
0LTI
Lost-time incidents to date
2RFIs
Open requests for information
05 / Client voice
“Every Friday at four we get the same report: strings installed, open questions, next week’s work. Twenty-one weeks in, nothing in it has surprised us — and the docks have not closed once.”
CJ
Carla Jensen
DIRECTOR OF FACILITIES · TAMSIN COLD CHAIN
BUILD VS PROGRAMME
WEEK 21
METRIC
PLAN
ACTUAL
Strings installed
180
186
Phase 04 progress
60%
62%
Open RFIs
≤ 3
2
Incidents
0
0
From the week-21 progress report, issued Friday 16:00 CT.
MORE FROM THE REGISTER
Distribution centre roof covered in solar modules above parked trucks
PREVIOUS · NB-0412

Harbor Logistics

Logistics · 1.2 MWp
Agricultural building with a rooftop solar array among fields
NEXT · NB-0302

Marlow Orchard Barn

Agri & Food · 96 kWp
Next step / Feasibility study

Send 12 months of bills. Get three priced options in 10 working days.

NO FEE · NO OBLIGATION · AN ENGINEER REPLIES IN ONE WORKING DAY
DIRECT LINES
SALES DESK
+1-555-0188
O&M DESK
24 / 7 / 365