A project hits its target in the first year, everyone moves on, and by the end of year two half the saving has quietly gone. We see this on roughly one site in three that comes to us after someone else’s retrofit.
Why it happens
Controls get overridden for one hot afternoon and never reset. A new line goes in without updating the baseline. Maintenance swaps a drive back to full speed. None of it is visible on a monthly bill that also moves with weather and production.
What M&V does
Measurement and verification compares actual use with what the site would have used without the project, adjusted for weather and output. We follow IPMVP Option C for whole-site savings and Option B where a single system is metered.
What a monthly report looks like
- Verified saving this month and to date, in dollars and kWh
- The adjustment model and its accuracy
- Any measure drifting more than 10% from plan
- One action for the site team
“Promised savings are a forecast. Verified savings are a fact your auditor can check.” — Samuel Adeyemi, M&V Lead