Home / Results / Orbis Medical Campus
FILE KE-P13 · REV. 10/2026
[ Case KE-C01 · Healthcare ]

Orbis Medical Campus,
31% less energy, 24/7.

A teaching hospital campus running steam, chillers and air handlers around the clock. The Level 3 audit found $1.4M a year in waste, and the board approved the full net-zero roadmap in one meeting.

HEALTHCARE
EASTON, MA
NET ZERO 2038
CASE FILE
KE-C01 · REV. 10/26
$1.4M/ YR
Measured saving after twelve months of M&V, weather-adjusted, across six buildings.
ENERGY CUT
31%
PAYBACK
2.6 years
NET ZERO
2038, board-approved
 
ON THIS PAGE
01   Audit sheet
02   Client voice
03   Measured year
04   Timeline
01 / Audit sheet

Six buildings, one plant room, no downtime.

Every figure comes from the audit report, the measure register or the M&V reports. Savings are measured against a weather-adjusted baseline, not modelled.

Facilities engineer inspecting a valve in a hospital boiler plant room
KE-C01
LEVEL 3 AUDIT · 2023
FIG. 01 — Steam header and boiler controls, central plant
AUDIT WEEK 2
FIG. 01 — Steam header and boiler controls, central plant
AUDIT WEEK 2
AUDIT SHEET · KE-C01
PE STAMPED
SCOPE
6 buildings · 2.1M sq ft
HOURS
24/7 · 365
AUDIT
ASHRAE Level 3 · 6 weeks
BASELINE
58.4 GWh a year
MEASURES FOUND
41
MEASURES CARRIED OUT
33
SAVING (MEASURED)
$1.4M a year
ENERGY CUT
31%
PAYBACK
2.6 years
CO₂E AVOIDED
5,400 t a year
NET ZERO
2038
CHALLENGE
A campus that never closes: operating theatres, labs and wards on steam and chilled water around the clock, with air handlers scheduled for the worst case in every room.
OUR RESPONSE
A Level 3 audit with loggers on every air handler and the steam plant. Occupancy-based schedules for non-clinical zones, steam-trap repairs, a heat-recovery chiller and a roadmap to 2038.
RESULT
A 31% cut measured over twelve months, $1.4M a year, without touching a single clinical air-change rate. The board approved the full roadmap in one meeting.
02 / Client voice
“Every other proposal we had came with a product attached. Kestrel showed us the data, priced every option and then measured what actually happened. That is why the board said yes in one meeting.”
DO
Daniel Okafor
VP OPERATIONS · ORBIS MEDICAL CAMPUS
M&V YEAR 1
IPMVP OPTION C
METRIC
ESTIMATE
MEASURED
Electricity
−28%
−29%
Steam
−35%
−37%
Peak demand
−22%
−24%
Cost a year
$1.32M
$1.40M
Weather- and occupancy-adjusted against the 2022 baseline. Monthly reports continue to 2027.
03 / Measured year

Twelve months, measured against the baseline.

Monthly campus energy in the baseline year and in the first full year after the measures — steam and electricity in one figure, weather-adjusted.

MONTHLY ENERGY · BASELINE VS MEASURED (MWh)
BASELINE YEAR
MEASURED YEAR
 
2,000 MWh
 
4,000 MWh
 
6,000 MWh
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
IPMVP OPTION C
WEATHER-ADJUSTED
0 H CLINICAL DOWNTIME
ANNUAL ENERGY BILL
M&V YEAR 1
LINE
BASELINE
MEASURED
Electricity
$2.61M
$1.86M
Steam & gas
$1.48M
$0.96M
Demand charges
$0.43M
$0.30M
Total a year
$4.52M
$3.12M
−31%
ENERGY, MEASURED
$1.4M
SAVED A YEAR
05 / Timeline

From desk review to verified savings in three years.

Most of the saving came from controls and steam in year one; the heat-recovery chiller followed once the measured data justified it.

JUL 2023
 
Desk review
Twelve months of bills and the plant list. The note pointed to steam and AHU schedules.
REVIEW
Q4 2023
 
Level 3 audit
Six weeks, loggers on 38 air handlers and the steam plant. 41 measures priced.
AUDIT
JAN 2024
 
Board approval
Roadmap to 2038 approved in one meeting, phase 1 funded the same day.
DECIDE
2024
 
Phase 1
Schedules, steam traps and controls — installed by tender, no clinical downtime.
INSTALL
2025
 
Phase 2
Heat-recovery chiller commissioned once M&V confirmed the load.
INSTALL
OCT 2026
 
Year 1 verified
31% measured; monthly M&V continues to 2027.
NOW
41MEASURES
Priced in the audit
33DONE
Carried out by Oct 2026
5,400t
CO₂e avoided a year
0H
Clinical downtime
MORE FROM THE REGISTER
Aerial view of a logistics warehouse roof covered in solar panels
PREVIOUS · KE-C09

Northgate Distribution

Logistics & Storage · Northgate, PA · $1.3M / yr
Technician reading a meter beside two industrial air compressors
NEXT · KE-C02

Harbor Mills

Manufacturing · Carver Falls, NH · $1.12M / yr
Next step / Free desk review

Send twelve months of bills. We will tell you where the waste probably is.

FREE · 5 WORKING DAYS · A SENIOR ADVISER CALLS, NOT A SALES TEAM