Home / Results / Harbor Mills
FILE KE-P13 · REV. 10/2026
[ Case KE-C02 · Manufacturing ]

Harbor Mills,
$1.12M found in the air.

Compressed air, oven exhausts and three buildings’ worth of BMS settings at a bakery and milling plant. The top five measures alone save $558k a year for $812k of capital.

MANUFACTURING
CARVER FALLS, NH
$214K INCENTIVES
CASE FILE
KE-C02 · REV. 10/26
$1.12M/ YR
Measured saving across 23 measures on three production lines, twelve months after installation.
BASELINE
18.4 GWh a year
PAYBACK
2.9 years
INCENTIVES
$214k secured
 
ON THIS PAGE
01   Audit sheet
02   Client voice
03   Measured year
04   Timeline
01 / Audit sheet

Three lines, 23 measures, one ring main.

Every figure comes from the audit report, the measure register or the M&V reports. The end-use split comes from two weeks of logging on every major load.

Technician reading a meter beside two industrial air compressors
KE-C02
LEVEL 2 AUDIT · 2025
FIG. 01 — Compressor house, line 2
AUDIT WEEK 2
FIG. 01 — Compressor house, line 2
AUDIT WEEK 2
AUDIT SHEET · KE-C02
PE STAMPED
SCOPE
Bakery and milling plant · 3 lines
AUDIT
ASHRAE Level 2 · 5 weeks
BASELINE
18.4 GWh a year
END USE
Air 31 · HVAC 27 · heat 22 · other 20 %
MEASURES FOUND
23
TOP 5 MEASURES
$812k → $558k / yr
SAVING (MEASURED)
$1.12M a year
ENERGY CUT
24%
PAYBACK
2.9 years
INCENTIVES
$214k secured
CO₂E AVOIDED
2,190 t a year · top 5
CHALLENGE
Energy was 9% of the plant’s costs and rising. Compressors ran flat out on weekends, oven exhausts never throttled down and the BMS still held commissioning setpoints from 2011.
OUR RESPONSE
Two weeks of logging, an ultrasonic leak survey and a measure register ranked by payback. We wrote the specs, ran the tender with the plant team and filed four incentive applications.
RESULT
A 24% cut measured after twelve months, $1.12M a year, and $214k of incentives that paid for a quarter of the capital.
02 / Client voice
“They found 190 leaks on a ring main we thought was fine — then wrote the spec and walked away from the tender. Nobody tried to sell us a compressor.”
RD
Rachel Dunn
PLANT MANAGER · HARBOR MILLS
END-USE REGISTER
M&V YEAR 1
END USE
SHARE
CUT
Compressed air
31%
−38%
HVAC
27%
−22%
Process heat
22%
−14%
Lighting & other
20%
−19%
Shares of the 18.4 GWh baseline; cuts measured per end use with permanent sub-meters, production-adjusted.
03 / Measured year

A flatter load, measured month by month.

Monthly plant energy in the baseline year and the first full year after the measures, adjusted for production tonnage.

MONTHLY ENERGY · BASELINE VS MEASURED (MWh)
BASELINE YEAR
MEASURED YEAR
 
500 MWh
 
1,000 MWh
 
1,500 MWh
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
JAN
FEB
MAR
APR
MAY
JUN
JUL
AUG
SEP
OCT
NOV
DEC
IPMVP OPTION C
PRODUCTION-ADJUSTED
190 LEAKS FIXED
ANNUAL ENERGY BILL
M&V YEAR 1
LINE
BASELINE
MEASURED
Electricity
$2.95M
$2.21M
Gas
$1.21M
$0.98M
Demand charges
$0.44M
$0.29M
Total a year
$4.60M
$3.48M
−24%
ENERGY, MEASURED
$1.12M
SAVED A YEAR
05 / Timeline

Eighteen months from bills to verified savings.

The top five measures went in over one summer shutdown; the rest followed as the incentive approvals came through.

MAR 2025
 
Desk review
Bills showed weekend load at 70% of weekday — the first clue.
REVIEW
APR 2025
 
Level 2 audit
Five weeks, two weeks of logging, 23 measures priced.
AUDIT
JUN 2025
 
Top 5 approved
$812k of capital approved; four incentive applications filed.
DECIDE
AUG 2025
 
Shutdown works
Leaks, a variable-speed compressor and exhaust controls in two weeks.
INSTALL
OCT 2025
 
Incentives paid
$214k received from two utility programmes.
GRANTS
OCT 2026
 
Year 1 verified
24% measured; the remaining 18 measures are scheduled.
NOW
23MEASURES
In the register
190LEAKS
Found and fixed
2,190t
CO₂e a year, top 5
$214kSECURED
Incentives, two utility programmes
MORE FROM THE REGISTER
A six-storey medical office building with timber cladding, rooftop solar and planted terraces
PREVIOUS · KE-C01

Orbis Medical Campus

Healthcare · Easton, MA · $1.4M / yr
An energy auditor using a thermal camera on an electrical panel in a plant room
NEXT · KE-C03

Calder Foods

Food & Cold Chain · Brookfield, VT · $640k / yr
Next step / Free desk review

Send twelve months of bills. We will tell you where the waste probably is.

FREE · 5 WORKING DAYS · A SENIOR ADVISER CALLS, NOT A SALES TEAM