Three distribution centres with high bays lit around the clock. LED with occupancy controls, dock-door seals and a 15-year rooftop solar PPA tendered without a broker’s commission.
Every figure comes from the audit report, the PPA tender file or the M&V reports. Grid energy and PPA energy are reported separately.

Monthly grid energy across the three centres in the baseline year and the first full year after LED, controls and the PPA.





LED and controls paid back fast enough to fund the dock works; the PPA tender ran in parallel and the array energised the following spring.