Home / Services / Energy Audits
FILE KE-S01 · REV. 10/2026
[ Service S-01 ]

Energy audits that
sell you nothing.

ASHRAE Level 2 and Level 3 audits by two engineers on site for 2–4 days. You get a measure register with costs, modelled savings ranges and paybacks — signed by a named PE reviewer, with no equipment quote attached.

ASHRAE LEVEL 2 & 3
4–8 WEEKS
FIXED FEE
AUDIT FILE
S-01 · ASHRAE L2/L3
22% OF SPEND
Average share of energy spend our audits identify as avoidable — modelled, ±15%.
FIXED FEE FROM
$18,500
ON SITE
2 engineers · 2–4 days
REPORT PACK
Week 6
 
ON THIS PAGE
01   What you get
02   Audit levels
03   The pack
04   FAQ
What you get

A register of measures, not a brochure.

Two engineers spend two to four days on site with loggers, current clamps and a thermal camera. They walk the plant, read the controls and measure what the bills only hint at: compressed air leaks, simultaneous heating and cooling, out-of-hours loads.

Back at Wharf Street every measure is costed, modelled against your interval data and given a savings range and payback. A senior reviewer challenges each one before a PE stamps the report — so the register you take to the board is one we would defend line by line.

AUDITS SINCE 2014
620+
AVG. FOUND
22%
AVG. PAYBACK
3.1YRS
Two auditors in hi-vis walking a factory floor
S-01 · SITE SURVEY
2 engineers · 2–4 days on site
FIG. 01 — A Level 3 walk-down on a production floor · compressed-air headers are logged for a full shift
EVERY AUDIT INCLUDES
10 ITEMS
Twelve months of bills and interval data analysed
Two engineers on site for 2–4 days
Temporary sub-metering on the big loads
Thermal survey of plant and envelope
Controls and set-point review
End-use breakdown of the whole site
Measure register with cost, saving range and payback
Incentives each measure may qualify for
PE stamp and a named senior reviewer
A results meeting with your board or finance team
WHAT AN AUDIT IS NOT
A guarantee of savings
SAVINGS ARE MODELLED RANGES, ±15%
An equipment quote
WE SELL NOTHING AND TAKE NO COMMISSION
A design for construction
MEASURES NEED ENGINEERING BEFORE TENDER
Tax advice
ASK YOUR OWN ADVISER ABOUT TAX TREATMENT
Audit levels

Pick the depth your decision needs.

Most sites start at Level 2. Level 3 is for capital projects that need investment-grade numbers; portfolio screens rank many buildings before anyone goes on site.

A-0

Desk review

Twelve months of bills and a short call. We tell you where the waste probably is — free, in five working days.

FEE
Free
ON SITE
No
TURNAROUND
5 working days
OUTPUT
Two-page memo
A-2

ASHRAE Level 2

Full walk-through, sub-metering and a costed measure register. The right start for most single sites.

FEE
From $18,500
ON SITE
2–4 days
TIMELINE
4–6 weeks
OUTPUT
Full pack
A-3

ASHRAE Level 3

Investment-grade detail on the big measures: longer logging, engineering estimates and a tighter range.

FEE
Fixed, by scope
ON SITE
Up to 4 days + logging
TIMELINE
6–8 weeks
OUTPUT
Full pack + detail
A-P

Portfolio screen

Many buildings ranked from bills and drawings, so audit money goes to the sites with the most to find.

FEE
Fixed, per site band
ON SITE
Sample sites only
TIMELINE
By portfolio size
OUTPUT
Ranked site list
HOW IT RUNS
From bills to board in six weeks.
01
DAY 1
Discovery call
Scope, sites and the data we need
02
DAY 5
Desk review
Where the waste probably is
03
WEEK 2
On site
Two engineers, loggers, thermal camera
04
WEEK 6
Pack + meeting
Report, register and board summary
Audit cases

Sites where an audit came first.

Technician reading a meter beside two industrial air compressors

Harbor Mills

23 measures · 18.4 GWh baseline · 2.9-year payback
$1.12M / yr
An energy auditor using a thermal camera on an electrical panel in a plant room

Calder Foods

Frozen-food plant · ammonia refrigeration · 22% cut
$640k / yr
Engineer with a clipboard inside a refrigerated cold store

Linwood Cold Stores

4 cold stores · 46 evaporators · 26% cut
$480k / yr
The pack

What lands on your desk in week six.

Every audit ends with the same five documents and a meeting. The register is a live spreadsheet, so your team can re-sort measures by payback, capex or carbon.

AUDIT PACK · LEVEL 2 / LEVEL 3
REV. 10/26
ITEM
WHAT IT IS
NOTE
REPORT
Audit report, about 80 pages
PE-stamped, named reviewer
REGISTER
Measure register (XLSX)
Cost, saving range, payback
ROADMAP
Phased roadmap, 24 pages
Measures in order by year
SUMMARY
Board summary, 8 pages
Written for non-engineers
M&V PLAN
Verification plan, 12 pages
IPMVP Option C baseline
LEVELS
ASHRAE Level 2 or Level 3
Level 3 = investment-grade
TIMELINE
4–8 weeks, pack in week 6
Depends on site count
FEE
Fixed, from $18,500
Agreed before we start
ESTIMATES
Savings shown as ranges
±15%, assumptions printed
Engineer clipping a temporary current clamp sub-meter inside an electrical panel
ACROSS 620+ AUDITS
What the average audit has found so far.
22%
Of energy spend
3.1YRS
Average payback
FAQ

Audit questions we hear on every call.

Short answers here. Tom’s team will go through scope and data with you on a 30-minute call before you commit to anything.

Portrait of Tom Brennick
Ask Tom Brennick’s team
Lead Auditor, Industrial
PHONE
REPLY
Within two working days

Level 2 or Level 3 — which do we need?

Level 2 suits most sites: it finds and costs the measures well enough to decide. Level 3 adds longer logging and engineering estimates for the large capital items, which lenders and boards often want before approving spend.

How much will we save?

We can’t promise a number. Across 620+ audits the average register has found about 22% of energy spend, but every measure is shown as a modelled range (±15%) with its assumptions. Measured results come from M&V after measures go in.

Do you recommend specific brands?

No. Measures are written as performance specifications, so any qualified installer can price them. We take no commission from manufacturers, installers or energy suppliers.

How much of our time does it take?

A discovery call, a data request (bills, drawings, BMS access), a site escort for 2–4 days and a results meeting. Most clients spend under three days of staff time in total.

What happens after the report?

Many clients implement with their usual contractors. Some add M&V to measure what arrived, a net-zero roadmap, or grants support to fund the measures. None of that is required.

Can you advise on tax treatment of the work?

No. We don’t give tax advice. If tax treatment affects your decision, please speak to your own accountant or adviser.

Next step / Free desk review

Send twelve months of bills. We will tell you where the waste probably is.

FREE · 5 WORKING DAYS · A SENIOR ADVISER CALLS, NOT A SALES TEAM