A 300 MW solar farm and a four-hour battery sharing one grid connection in Pinal County. The battery fills from the site's own panels and carries Arizona through its evening peak.

Pinal County, Arizona
Operating since Jun 2023
 
Own Solar
Battery charge
94%

Share of the battery's charge that came from the site's own panels over the last twelve months.

 
 
 
 
 
 
 
 
 
 
 
Project · Hybrid
 
300 MW solar · 300 MW / 1.2 GWh storage
01The Site
 
Operating since Jun 2023

One Connection, Two Jobs

Why the battery sits beside the panels, and what that changed for the buyer.

01

The Problem

By 2022 Arizona had more solar at noon than it could use, and an evening peak that still ran on gas. A solar farm alone would have added to the midday glut.
02

What We Built

300 MW of trackers and a 300 MW / 1.2 GWh LFP battery behind one shared grid connection, so the battery charges straight from the panels without touching the grid.
03

What It Does Now

Summer evenings from 18:30 to 22:30 run on stored sunshine. Round-trip efficiency is 87%, and 94% of the battery's charge comes from the site's own solar.
 
Spec Sheet
Project TV-2021-02
Location
Pinal County, Arizona
Technology
Trackers + co-located LFP battery
Capacity
300 MWac solar · 300 MW / 1.2 GWh storage
Status
Operating since Jun 2023
Offtake
20-year agreement with an investment-grade utility
Round-trip efficiency
87%
Charged from own solar
94%
Evening delivery
18:30–⁠22:30 in summer
02Dispatch Log
 
3 evenings · all delivered

Three Hard Evenings, All Delivered.

Every discharge is logged by the control room. Here are three of the hardest from this summer, and the hottest in full.

Evening
Discharge
Charge
Result
18 Jul 2026
Heat wave, 46 °C in Phoenix
4 h 00 m
100% → 6%
Peak served
02 Aug 2026
Monsoon cloud at noon
3 h 20 m
81% → 9%
Grid top-up
14 Sep 2026
Planned inverter work
2 h 10 m
62% → 30%
Notice 48 h
87%
94%
4 h
Round-trip efficiency
Charged from own solar
Every summer evening
Hottest Evening
18 Jul 2026
12:30
Battery full from the site's own solar
18:30
Discharge starts at 300 MW
19:45
Phoenix demand peaks · 46 °C
20:40
Control room holds 300 MW · 52%
22:30
Discharge ends · 6% left
23:10
Battery idle until the panels refill it
Charge through the evening
100% → 6%
 
 
 
 
 
 
 
 
03Gallery
 
Photos · Pinal County

Around Saltbush

Panels, containers and the inverter skids between them.

Aerial view of a hybrid solar and battery plant in the high desert at blue hour
Blue hour · panels resting, battery about to start
Aisle between battery storage containers at dusk
Aisle between battery storage containers at dusk with a technician walking away
Container aisle · 75 enclosures
A technician checking an inverter skid
A field technician checking an inverter and transformer skid on a solar farm
Inverter skid check · monthly round
04Evening Delivery
 
Nov 2025 → Oct 2026

Stored Sun, Month by Month

Energy the battery delivered into the evening, against the forecast in the buyer's agreement.

Evening delivery from the battery, GWh
 
Forecast · avg 29
 
Delivered · avg 30
10
20
30
40
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Nov
Dec
Jan
Feb
Mar
Apr
May
Jun
Jul
Aug
Sep
Oct
Longest discharges June to August, when the evening peak runs past 22:00
Forecast
346
GWh · contract forecast
Delivered
355
GWh · metered at the connection
Difference
+9
GWh · 2.6% over forecast
05In Their Words

The Evening the Valley Hit 46 °C

Ray Begay, Head of Operations & Safety, on 18 July.

The buyer called at three to ask if we would hold. We had been full since half past twelve. At half past six the panels went quiet, the battery picked up 300 megawatts and nobody in Phoenix knew it had happened.

Portrait of Ray Begay
Ray Begay
Head of Operations & Safety · Terravolt
4 h at full power
6% left at 22:30
Utility-scale solar farm at dusk seen from the air, tracker rows running to the mountains
Previous Project
Dunmore Flats
Next Project
Corvo Mesa
Corvo Mesa tracker rows on a New Mexico mesa
 
Land · Power · Partnerships

Let’s Build the Next Gigawatt.

Landowners, utilities, corporate buyers and suppliers — tell us about your site or your demand, and the right Terravolt team replies within two working days.

41 sites · seven states
 
Develop · build · own · since 2012
 
Rather Talk It Through?

Speak to the team that runs the plant.

+1-⁠555-⁠0190
Head office · Mon–Fri 8:00–⁠17:30 MST
[email protected]
Landowners & communities
1200 Mesa Verde Blvd, Suite 900
Head office · Sandoval, AZ 85000
[email protected]
Investor relations