A 610 MW solar farm and a 200 MW four-hour battery on the Texas plains, built to deliver around the clock for one customer: solar by day, the battery across the evening.

Lubbock County, Texas
In construction · COD Q2 2027
 
Construction
Complete
31%

Piling under way and battery pads poured; commercial operation planned for the second quarter of 2027.

 
 
 
 
 
 
 
 
 
 
 
Project · Hybrid · building
 
610 MW solar · 200 MW / 0.8 GWh storage
01The Site
 
Construction · 31% complete

One Buyer, Around the Clock

What Arden Plains will deliver, who it is for and how it is contracted.

01

The Customer

A Southwest data-centre operator wanted clean power shaped to its load, not just at noon. It signed a 20-year power agreement for Arden Plains in 2026.
02

What We Are Building

610 MW of trackers and a 200 MW / 0.8 GWh battery under a 15-year tolling agreement, so the evening comes from stored sunshine and the rest from grid purchases.
03

How It Was Financed

Arden Plains is the second half of our $1.3B green project financing, closed with eleven lenders on 9 October 2026 alongside Kettle Basin.
 
Spec Sheet
Project TV-2024-06
Location
Lubbock County, Texas
Technology
Trackers + 200 MW four-hour battery
Capacity
610 MWac solar · 0.8 GWh storage
Status
Construction 31% complete
Commercial operation
Planned Q2 2027
Offtake
20-year agreement with a data-centre operator
Battery
15-year tolling agreement
Financing
Part of the $1.3B green financing, Oct 2026
02Build Log
 
31% complete · on schedule

From Plains to Plant, Week by Week.

The milestones so far, and the day the financing closed — with the crew still on site.

Milestone
Duration
Progress
Status
Apr 2026
Site works and roads
8 weeks
100%
Complete
Jun 2026
Piling, solar blocks
16 weeks
72%
On schedule
Sep 2026
Battery foundations
12 weeks
25%
On schedule
Oct 2026
Grid connection works
34 weeks
10%
Started
31%
Q2 2027
20 yrs
Construction complete
Planned operation
Data-centre agreement
Financing Day
09 Oct 2026
06:30
Crew of 410 signs in on site
09:00
Financing closes · $1.3B, 11 lenders
11:00
Piling reaches block 22
14:00
Battery pad 3 poured
16:30
Daily report to the control room
17:00
Zero recordable incidents
Construction complete
31%
 
 
 
 
 
 
 
 
03Gallery
 
Photos · Lubbock County

Around Arden

What the finished plant will look like, the battery it will carry and the room that will run it.

Aerial view of solar rows with battery containers and an access road
Solar rows and battery yard · a finished Terravolt hybrid
Rows of white battery containers beside a solar farm
Rows of white battery containers beside a solar farm with technicians on the access road
Battery containers of the same design
Operators in the Terravolt control room in Sandoval at dusk
Operators in the Terravolt control room in Sandoval at dusk
Arden Plains will report to Sandoval every five seconds
04In Their Words

Built to a Load, Not a Clock

Kevin Tran, Head of Energy Markets & Storage, on shaping the output.

The customer does not switch off at sunset, so the plant cannot either. Solar covers the day, the battery covers the evening and we buy the rest. Our job is to make that seam invisible.

Portrait of Kevin Tran
Kevin Tran
Head of Energy Markets & Storage · Terravolt
20-yr power agreement
15-yr battery tolling
Kettle Basin under construction, a telehandler lifting a pallet of panels
Previous Project
Kettle Basin
Next Project
Pinyon Gap
The permitted Pinyon Gap site, open high desert with pinyon pines and a survey stake
 
Land · Power · Partnerships

Let’s Build the Next Gigawatt.

Landowners, utilities, corporate buyers and suppliers — tell us about your site or your demand, and the right Terravolt team replies within two working days.

41 sites · seven states
 
Develop · build · own · since 2012
 
Rather Talk It Through?

Speak to the team that runs the plant.

+1-⁠555-⁠0190
Head office · Mon–Fri 8:00–⁠17:30 MST
[email protected]
Landowners & communities
1200 Mesa Verde Blvd, Suite 900
Head office · Sandoval, AZ 85000
[email protected]
Investor relations