

A stand-alone 150 MW / 600 MWh battery beside an existing New Mexico substation, contracted to a utility for evening capacity and built on land already zoned for energy.
Ready to discharge whenever the utility called, across the last twelve months.
Why Mesquite Draw was quick to build, and what the utility buys from it.
Containers on gravel pads, the aisle checks and the fire crew who know the site.





Energy delivered to the utility each month, against the dispatch forecast.
Ray Begay, Head of Operations & Safety, on the fire plan.
