By

Nadia Price
Top-down aerial view of a solar farm with an inverter station and parked service vans

Terravolt Closes $1.3B Green Financing for Kettle Basin and Arden Plains

Eleven lenders and the largest construction loan in the company's history, for 1.12 GW now being built.
Read article
Rows of white battery containers beside a solar farm with technicians on the access road

Red Hollow Storage Passes One Full Year Above 98% Availability

Our largest battery, 400 MW / 1.6 GWh in Texas, finished its first twelve months available 98.4% of the time.
Read article
Aerial view of a hybrid solar and battery plant on the Texas plains at sunset

Twenty-Year Power Agreement Signed With a Southwest Data-Centre Operator

A 20-year agreement for 300 MW of solar and storage output from Arden Plains, delivered around the clock.
Read article
Sheep grazing between solar tracker rows in evening light

Sheep Return to Dunmore Flats for a Fourth Grazing Season

2,600 sheep from two local ranches now keep the grass down across 1,900 acres of solar.
Read article
Two technicians inspecting a solar tracker drive with a tablet

Second-Quarter Output Up 19% as Corvo Mesa Trackers Upgrade

Fleet generation rose 19% year on year, helped by new operating capacity and a tracker control upgrade.
Read article
Solar panel rows at dusk under a sand-gold sky with mountains behind

Green Bond Allocation Report: $640M Deployed Across Nine Sites

Where every dollar of our 2024 green bond went, site by site, with the impact measured for each.
Read article
A rancher and a Terravolt land manager reading a map on a pickup tailgate

Pinyon Gap Receives Its Final County Permit

A 350 MW solar farm in Utah, three years from first landowner meeting to the last signature.
Read article
Operators in the Terravolt control room in Sandoval at dusk

Inside the Sandoval Control Room

Eleven people, two shifts and every inverter in the fleet, read every five seconds.
Read article