Category

Projects
Rows of white battery containers beside a solar farm with technicians on the access road

Red Hollow Storage Passes One Full Year Above 98% Availability

Our largest battery, 400 MW / 1.6 GWh in Texas, finished its first twelve months available 98.4% of the time.
Read article
A rancher and a Terravolt land manager reading a map on a pickup tailgate

Pinyon Gap Receives Its Final County Permit

A 350 MW solar farm in Utah, three years from first landowner meeting to the last signature.
Read article
Operators in the Terravolt control room in Sandoval at dusk

Inside the Sandoval Control Room

Eleven people, two shifts and every inverter in the fleet, read every five seconds.
Read article