Ten battery containers beside our oldest farm. They charge when the wind blows at night and the grid doesn’t need it, and give it back at the evening peak.
The yard uses Calder Ridge’s existing substation and grid connection — no new line, no new pylons. Figures from the first full winter, 2025–26.

The yard was built inside a year, but most of that year went on the fire plan and the drainage — the two questions neighbours asked first.
The yard works hardest from October to March, when windy nights and dark evenings coincide. The winter came in 4% under forecast cycles — and 99.1% available.